Similar Projects
1st Avenue South Improvements - 22C02 - City of Naples
Infrastructure
Conception
$6,272,000 CJ est. value
Naples, FL 34102

1st Avenue South Improvements - 22C02 - City of Naples
Infrastructure
Conception
$6,272,000 CJ est. value
Naples, FL 34102

Old Naples Hotel at Third Street Plaza
Demolition, New Construction, Infrastructure - 3,800 SF
Design
$35,000,000 CJ est. value
Naples, FL 34102

Old Naples Hotel at Third Street Plaza
Demolition, New Construction, Infrastructure - 3,800 SF
Design
$35,000,000 CJ est. value
Naples, FL 34102

Resurfacing - SR 90 (US 41)
Infrastructure
Bidding
$3,367,086 CJ est. value
Ochopee, FL 34141

Resurfacing - SR 90 (US 41)
Infrastructure
Bidding
$3,367,086 CJ est. value
Ochopee, FL 34141

Sanders Residence
New Construction, Infrastructure - 3,740 SF
Sub-Bidding
$400,000 CJ est. value
Naples, FL 34110

Resurfacing Courts at Various County Parks Project
Post-Bid
Naples, FL

Paver Maintenance
Post-Bid
Naples, FL

Annual Street Resurfacing
Results
Marco Island, FL

Randall Boulevard at Everglades Boulevard Intersection Improvements
Results
$1,109,000 est. value
FL 34120

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

St. Matthew's House Renovation
Addition, New Construction, Renovation, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Naples, FL 34112

Unidos Restaurant
Renovation, Infrastructure - 5,625 SF
Pending Verification
$150,000 CJ est. value
Naples, FL 34102

Phase II North Beach Outfall Removal & Water Quality Project - 22V26 - City of Naples
Infrastructure
Conception
$15,500,000 CJ est. value
Naples, FL 34102

Last Updated 10/03/2022 11:10 AM
Project Title

Lantern Lane Improvements - 22V11 - City of Naples

Physical Address View project details and contacts
City, State (County) Naples, FL 34102   (Collier County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $310,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Lantern Lane is a two-lane residential street that is approximately 3,000 linear feet in length. Approximately 1,700 feet of Lantern Lane meets the minimum roadway width of 18-feet (two 9-foot travel lanes) and has concrete valley gutters to collect stormwater and direct it to storm inlets. Approximately 1,300 feet of roadway does not meet these standards yet was accepted by the City from the area's original developer. The inadequate roadway width, along with the incomplete drainage system causes several problems for general motorists and abutting property owners. For example, the inadequate roadway width causes vehicles to travel outside the pavement and upon the green portion of the right-of-way causing damage to greenspace. Additionally, the incomplete gutter system requires stormwater to drain through the greenspace, making it soft and susceptible to rutting. Over two fiscal years, this project would bring this 1,300-foot section of Lantern Lane up to City standard for minimum road width and will complete a section of concrete gutter drainage. Funds are budgeted within this fund and the Stormwater Enterprise Fund. In FY21-22, funds are budgeted to survey, design and permit the project. In FY22-23, funds are budgeted to construct the project. As of October 3, 2022, this project is included in the City of City of Naples FY 2023-2027. Information regarding design firm and general contractor selection timeline has not been released. The design and firm construction timeline have not been disclosed. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents