Similar Projects
Deer Creek Plant Improvements - 20600 North Portland Avenue (Ward 8) - City Of Oklahoma City
Renovation
Conception
$1,546,000 est. value
Edmond, OK 73012

Kenwood Hills Water System Improvements- Construction - WL1903 - City of Broken Arrow
Renovation
Conception
$428,000 est. value
Broken Arrow, OK

Water Reclamation Facility Dewatering Centrifuge Replacement - WW0326 - City of Norman
Renovation
Design
$2,500,000 CJ est. value
Norman, OK 73072

Newcastle Wastewater Treatment Plant Improvements
Renovation
Design
$25,000,000 CJ est. value
Newcastle, OK 73065

FY '22 Water Pollution Control Capital Equipment Replacements
Alteration
Post-Bid
Tulsa, OK

2021 CDBG Wastewater Treatment Improvements
Renovation
Post-Bid
$500,000 CJ est. value
Grandfield, OK 73546

Kingfisher WWTP Rehabilitation
Renovation
Results
Kingfisher, OK

Holdenville Wastewater Treatment Plant Improvements
Renovation
Results
Holdenville, OK 74848

Hochatown - Offsite Improvements - WP #1 - Access Roadway & Facility Maintenance Building
New Construction, Infrastructure
Construction
$5,000,000 CJ est. value
Hochatown, OK 74728

Wastewater Treatment Plant Improvements South Canadian Wastewater Treatment Plant
Renovation, Infrastructure
Post-Bid
$203,529,800 CJ est. value
Oklahoma City, OK 73170

Lynn Lane Wastewater Treatment Plant Disinfection Improvements
Renovation
Results
Broken Arrow, OK 74012

Lynn Lane WWTP Filter Press Replacement Procurement
Renovation
Post-Bid
$610,000 CJ est. value
Broken Arrow, OK 74011

Lynn Lane WWTP East Clarifier Rehabilitation
Infrastructure
Results
Broken Arrow, OK 74011

Adams Creek Basin Study - City of Marianna
Infrastructure
Post-Bid
$1,415,000 CJ est. value
Broken Arrow, OK 74012

C6 Northside Waste Water Treatment Plant Anaerobic Digester 1 and 2 Improvements
Renovation, Infrastructure
Results
$2,391,975 CJ est. value
Tulsa, OK 74117

Last Updated 03/29/2023 09:07 AM
Project Title

Hefner Surge System Operational Enhancements Hefner Water Treatment Plant

Physical Address View project details and contacts
City, State (County) Oklahoma City, OK 73120   (Oklahoma County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $2,109,985 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Work herein contemplated consists of furnishing all labor, materials, equipment, transportation, and incidentals necessary and required for the complete installation of mains and appurtenances. This will include, but is not limited to, the following major items and appurtenances. (1) Earthwork and Shoring (2) Removal of Existing Main(s) and Vaults (3) Construction of New Utility Vault (4) Re-connection from Existing Main(s) to Surge Tower (5) Installation of Circulation Line from Surge Tower to Clearwells (6) Incidental Painting and Restoration of Surge Tower (7) Activation of New Main and Appurtenances, Chlorination and Testing (8) Connection to Hefners SCADA System (9) Site Grading (10) Restoration and Cleanup (11) Provide As-Built Plans with GPS As Built Survey OCWUT WT-0246, Hefner Surge System Operational Enhancements, Hefner Water Treatment Plant PreQual Class Water Facilities Contractor B Q & A deadline: Aug 16, 2022 8:00:00 AM CDT Bidders must be prequalified, on the Bid Date and Bid Time, by the Prequalification Review Board, established by Oklahoma City Municipal Code Section 13-401, Oklahoma City Ordinance No. 26,614 (2020), for the class(es) and subclass(es) of work required in the Bidding Documents. Bidders are responsible for obtaining the necessary equipment and software to attend this mandatory Pre-Bid Conference via Teams. Attendance at this mandatory Pre-Bid Conference is also a prequalification requirement. Additional information is contained in the Bidding Documents. Prior to bidding this project, Bidders must carefully read the Bidding Documents (and addenda, if any) and the City of Oklahoma City Standard Specifications for Public Improvements prior to bidding this project.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents