Similar Projects
Pre-Conditioned Air Unit
Post-Bid
Buffalo, NY 14203

Water Pollution Control Facility Boiler/Cooling Water Treatment
Post-Bid
Williamsville, NY 14221

HVAC Equipment_Service and Preventative Maintenance Contract
Results
Buffalo, NY 14207

Lake Shore Library HVAC Replacement
Results
Hamburg, NY 14075

2020 - 2025 Central Air Conditioning System Inspections With Preventative Maintenance, Start Up and/or Repair Service
Term Contract
Post-Bid

Removal and Replacement of a HVAC Unit
Results
Buffalo, Cheektowaga, NY 14201

Buffalo Zoo - Cooling Tower Replacement
Post-Bid
Buffalo, NY 14202

Rehabilitate Kitchen Ventilation System at Wende CF
Results
$275,000 to $550,000 est. value
Alden, NY 14004

On Call HVAC Services
Term Contract
Post-Bid
Buffalo, NY 14202

MTC - AHU 7 Replacement
Results
Buffalo, NY 14203

HVAC/Refrigeration Replacement & Maintenance
Term Contract
Post-Bid

HVAC Rooftop Replacement
Results
Buffalo, NY 14203

Hamburg Palace Theatre – Roof & 2nd Floor HVAC
Renovation - 4,470 SF
Post-Bid
$182,000 est. value
Hamburg, NY 14075

Kitchen Exhaust Hoods and Exhaust Fan Cleaning and Inspection
Term Contract
Results
Cheektowaga, Tonawanda, West Seneca, NY 14224

Grand Island Town Hall HVAC Upgrades - Phase 1
Post-Bid
Grand Island, NY 14072

Last Updated 11/12/2019 02:14 PM
Project Title

J--HVAC Cleaning of Wards 5C and 9A (VA-19-00018526)

Physical Address View project details and contacts
City, State (County) Buffalo, NY NY   (Erie County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

General Specifications for the Cleaning of Patient Wards 5C and 9A Heating, Ventilating & Air Conditioning (HVAC) System and Chilled Water Valances. This section defines the minimum requirements necessary to render HVAC components clean, and to verify the cleanliness through inspection and/or testing in accordance with items specified herein and applicable NADCA Standards. The Contractor shall be responsible for the removal of visible surface contaminants and deposits from within the HVAC system in strict accordance with these specifications. The HVAC systems serving the patient wards 5C and 9A are served by air handling units independent to the wards themselves, and includes any interior surface of the air distribution system for conditioned spaces and/or occupied zones. This includes the entire heating, air-conditioning and ventilation system from the points where the air enters the system to the points where the air is discharged from the system. The outside air intake grilles, outside air ducts to the air handling unit (AHU), the interior surfaces of the AHU, mixing box, coil compartment, condensate drain pans, humidifiers, supply air ducts, fans, fan housing, fan blades, air wash systems, spray eliminators, turning vanes, filters, filter housings, reheat coils, and supply, return and exhaust diffusers are all considered part of the HVAC system. The HVAC system also includes several dedicated exhaust systems which is included in this scope of work. The exhaust systems that go into the duct chase's will be cleaned up to the duct chase only, this includes the exhaust fans, exhaust diffusers, and all other exhaust system components.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents