Similar Projects
Valley Springs Middle School Mechanical Upgrade
Bidding
Arden, NC 28704

Removal and Replacement of Two (2) Hot Water Heaters
Bidding
Wilmington, NC

US Cellular Center Mechanical/HVAC Renovation
Post-Bid
Asheville, NC

J--Chiller Inspection and Maintenance
Post-Bid
Asheville, NC 28805

Steam Distribution System Replacement Phase IV-A
Results
Less than $2,000,000 est. value
Greensboro, NC

South Wilmington Street Center - Mechanical System Replacement
Results
Raleigh, NC

Boiler Service and Inspection
Term Contract
Post-Bid
Pembroke, NC

Boiler Replacement in Killian Building
Results
Less than $61,890 est. value
Flat Rock, NC

Upgrade Chiller Plant Fort Bragg, NC
Post-Bid
Fort Bragg, NC 28307

Ultrasoft Water Softener Unit
Results
Camp Lejeune, NC 28547

Hope Mills Library Boiler Replacement
Post-Bid
Hope Mills, NC 28348

Northern Wake Campus Exterior Hydronic Piping and Equipment Addition
Results
Raleigh, NC

Blue Ridge Community College Spearman Building Boiler 1 Replacement
Post-Bid
Flat Rock, NC 28731

North Buncombe Elementary School Boiler Replacement
Results
Less than $74,367 est. value
Weaverville, NC 28787

Reverse Osmosis System for 30 Locations
Post-Bid
NC

Reported 03/31/2021 12:00 AM
Project Title

Sumner Elementary Chiller Replacement Project

Physical Address View project details and contacts
City, State (County) Greensboro, NC 27406   (Guilford County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1. The removal of an existing air cooled chiller and 2-split system air handlers with condensing units. 2. Installation of a new air cooled chiller with integral pump package and associated chilled water piping. 3. Two new ground mounted package units with exterior ductwork. 4. New natural gas piping installation associated with new package unit installation. 5. New mechanical yard construction will include concrete equipment pads, mechanical yard. fencing, minor grading.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Packaged Water Chillers.
Division 42 - Process Heating, Cooling, and Drying Equipment, Process Chillers and Coolers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents