Similar Projects
Martin Luther King Jr Boulevard / Jack Warner Parkway Improvements - Phase I
Post-Bid
Tuscaloosa, AL 35403

Owners Agent for Design-Build Projects
Post-Bid
Camden, Fayette, Thomasville, AL

Southern Region Disaster Recovery Support BPA
Results

South - Regional Construction MATOC
Results
$500,000 to $1,000,000 est. value

Hay Court, Crescent East and Branscomb 2020 Development Improvements Project
Post-Bid
Tuscaloosa, AL 35401

Resurfacing of Local Streets 2020 Project
Results
Less than $3,486,717 est. value
Tuscaloosa, AL 35403

Project to Widen the Existing Access Road
Infrastructure
Post-Bid
Tuscaloosa, AL

Rock Quarry Boat Landing Parking Lot Improvements
Results
$322,361 est. value
Cottondale, AL 35453

River District Park Construction
Infrastructure
Post-Bid
Tuscaloosa, AL 35407

Constructing the Planing, Resurfacing, Traffic Signals, Traffic Signs, and Traffic Stripe on SR-215
Results
$2,424,051 to $2,962,729 est. value
Tuscaloosa, AL 35401

Constructing The Additional Lanes On Sr-7 (Us-11) From The Junction Of Diamler-Benz Boulevard To The Intersection Of Sr-5 In Vance
Results
$351,868 to $430,061 est. value
Vance, AL 35490

Bryce Campus Utilities and Infrastructure
Results
$1,200,000 to $1,400,000 est. value
Tuscaloosa, AL

Constructing the Safety Widening, Micro-Milling, Resurfacing, Guardrail Replacement, and Traffic Stripe
Results
$5,156,715 to $6,302,652 est. value
Duncanville, AL 35456

FY 2021 Annual Road Repairs and Renewal
Term Contract
Results
$650,000 est. value
Tuscaloosa, AL 35406

Constructing the Micro-Milling and High Friction Surface Treatment for Loop Ramps
Results
$499,316 to $610,275 est. value

Last Updated 12/22/2021 10:27 AM
Project Title

Martin Luther King Jr Boulevard / Jack Warner Parkway Improvements - Phase II

Physical Address View project details and contacts
City, State (County) Northport, Tuscaloosa, AL 35476   (Tuscaloosa County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,948,916
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A. The Project shall be known as Martin Luther King Jr Boulevard / Jack Warner Parkway Improvements – Phase II and the general character of said public works project shall consist of the following: The widening of approximately 1800 LF of Jack Warner Pkwy from Greensboro Ave to 21st Ave to include grade, drain, base and pave, curb and gutter, installation of sanitary sewer, installation of water mains, pedestrian traffic signal removal and installation, installation of underground private utilities, landscaping, irrigation, lighting and security cameras. B. The approximate quantities of said Project are as follows: 875 CY of borrow excavation; 12,000 CY of unclassified excavation; 3,700 LF of curb and gutter; 1,500 LF reinforced concrete pipe; 1,000 tons of asphalt wearing surface; 3,500 tons of asphalt binder; 28,000 SY of Crushed Aggregate Base (6” Compacted Thickness); 750 LF of sanitary sewer main; 1,900 LF of ductile iron water main; 12 decorative light poles and all other items required to complete the job as listed in the Bid Quantities.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents