Similar Projects
Flowers Chapel Road Widening Phase II - City of Dothan
Infrastructure
Conception
$5,100,000 CJ est. value
Dothan, AL 36305

Murphy USA #7171/7856 / Russellville
Demolition, New Construction, Infrastructure
Conception
$1,500,000 CJ est. value
Russellville, AL 35653

New Intracoastal Waterway Bridge - City of Orange Beach
New Construction, Infrastructure
Design
$28,000,000 CJ est. value
Orange Beach, AL 36542

Fire Station #10 Construction - City of Dothan
New Construction, Infrastructure
Design
$5,500,000 CJ est. value
Dothan, AL 36301

MSIC Material Exploitation Center Redstone Arsenal
Addition, Demolition, Infrastructure - 9,890 SF
Bidding
$250,000,000 CJ est. value
Huntsville, AL 35808

US Highway 231 Water Line Replacement
Infrastructure
Bidding
$400,000 CJ est. value
Blountsville, AL 35031

Tennis Court Resurfacing Project
New Construction
Post-Bid
Decatur, AL

Bleacher Replacement at Hamilton High School
New Construction
Post-Bid
Hamilton, AL 35570

Mac Gray Park 2020 Improvements
Results
Less than $5,500,000 est. value
Prattville, AL 36067

Tennis Courts Resurfacing Project
Results
$83,200 est. value
Trussville, AL 35173

New Baseball Softball Tennis Complex
Infrastructure
Construction
$6,732,900 est. value
Gadsden, AL 35901

Rural King - Building and Site Work
New Construction, Infrastructure - 86,439 SF
Construction
Albertville, AL

The Taylor
New Construction, Infrastructure
Pending Verification
$70,000,000 CJ est. value
Opelika, AL 36801

Freddys Frozen Custard & Steakburgers / Jasper
Demolition, New Construction, Infrastructure
Pending Verification
$900,000 CJ est. value
Jasper, AL 35501

The Gables On Lawrence
New Construction, Infrastructure
Conception
$51,000,000 CJ est. value
Fairhope, AL 36532

Last Updated 09/23/2022 10:07 AM
Project Title

Scottsboro High School Athletic Fields Turf Conversion Project

Physical Address View project details and contacts
City, State (County) Scottsboro, AL 35768   (Jackson County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $660,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following work: Replacing existing grass softball and baseball fields (1 each) with synthetic turf, installation of new under-field drainage system, replacement of foul poles, outfield and perimeter fencing, project mobilization, demolition of existing fields, site preparation and related items, all in accordance with final plans, specifications and contract documents. The Instruction for Bidders, Form of Bid, Form of Contract, Plans, Specifications, and Form of Bid Bond, Performance and Payment Bonds, and other Contract Documents may be examined, and copies may be obtained at the following address: Scottsboro City Schools 305 S. Scott Street Scottsboro, AL 35768. Additional information related to the Project may be obtained by email from Jeremy Bain at Olympia Engineering ("Engineer") (jeremy@olympiaengineering.net). The Owner reserves the right to waive any informalities or technical errors, or to reject any or all bids if in their judgment, to do so would serve the best interests of the Owner. Each bidder must deposit with its bid, security in the amount, form and subject to the conditions provided in the Instruction for Bidders. All Bidders must comply with the requirements of the State Licensing Board for General Contractors (Lat-est Edition) and with Title 39, Code of Alabama, 1975 as Amended) relating to com!petitive bid laws for public works. All bidders must be properly licensed in accordance with the requirements of the State Licensing Board for General Contractors (Chapter 8, Title 34, Code of Alabama, 1975) and be certified for the type of work required for the Project. No bidder may withdraw his bid within 60 days after the actual date of the opening thereof. Bidders must show satisfactory evidence of proper licensure before bidding. Failure to provide such evidence will result in rejection of the Bid for receipt or consideration by the Engineer. The Bidder's license number must be clearly displayed on the outside of the envelope in which the Proposal is delivered. Bids will not be accepted from General Contractors who do not attend the PreBid Conference. Minutes of the meeting will be prepared and issued to all Contractors who attend. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including Addenda if any, obtained from sources other than the Issuing Office. Bid security shall be furnished in accordance with the Instruction to Bidders.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents