Similar Projects
Sidewalk Maintenance
Infrastructure
Bidding
Beloit, WI

Henry Avenue Resurfacing
Infrastructure
Bidding
Beloit, WI 53511

Airfield Paving Construction MATOC
Post-Bid
Less than $400,000,000 est. value

Asphalt Mill and Overlay
Post-Bid
Edgerton, WI

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Big Hill Pathway
Infrastructure
Bidding
Beloit, WI 53511

2021 Paving South Creek Road from Shopiere Road to East West Hart Road
Infrastructure
Post-Bid
Beloit, WI 53511

City Owned Parking Lot Rehabilitation - East Lawn Cemetery
Results
Beloit, WI 53511

Big Hill Bike Path
Infrastructure
Bidding
Beloit, WI

2021 Crack Sealing
Infrastructure
Post-Bid
Beloit, WI

Operations Truck Ramp, Scale and Drainage Improvements
Results
Beloit, WI

2021 Water Service Replacements
Infrastructure
Bidding
$60,000 est. value
Milton, WI

2021 Street Resurfacing
Infrastructure
Post-Bid
Orfordville, WI

2020 Concrete Pavement Maintenance and Repairs
Results
Less than $78,000 est. value
Milton, WI 53563

Last Updated 07/28/2021 09:51 AM
Project Title

Euclid Avenue Reconstruction; Phase 1 and 2

Physical Address View project details and contacts
City, State (County) Beloit, WI 53511   (Rock County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Phase 1: 4350 SY of asphalt road replacement with curb and gutter, 2770 SF of concrete sidewalk, 1386 LF of 8-Inch water main, 65 LF of 6- Inch water main, 681 LF of water service, and miscellaneous items associated with above work. Phase 2: 3940 SY of asphalt road replacement with curb and gutter, 3800 SF of concrete sidewalk, 21 LF of 10-Inch water main, 1341 LF of 8-Inch water main, 24 LF of 6-Inch water main, 718 LF of water service, and miscellaneous items associated with above work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents