Similar Projects
USH 14 - Re/Reconditioning / Mill and Overlay
Infrastructure
Conception
$1,000,000 est. value
Evansville, WI 53536

North West Interceptor Splitter Box Construction and Slip Lining - City of Beloit
Renovation, Infrastructure
Conception
$250,000 CJ est. value
Beloit, WI 53511

Illinois State Line - Madison Incident Management
Infrastructure
Design
$4,000,000 CJ est. value
Janesville, WI 53546

Illinois State Line - Madison Incident Management
Infrastructure
Design
$4,000,000 CJ est. value
Janesville, WI 53546

2022 Parking Lot Improvements
Infrastructure
Post-Bid
$100,000 est. value
Janesville, Monroe, WI 53546

Liberty, Shirland and Willowbrook Concrete Panel Replacement
Alteration
Post-Bid
$400,000 est. value
Beloit, WI

M-H Townline Road Reconditioning
Infrastructure
Results
WI

Traxler Park Roadway Improvements
Infrastructure
Results
$100,000 est. value
Janesville, WI 53545

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Janesville Ice Arena - City of Janesville
Demolition, New Construction, Infrastructure
Pending Verification
$33,000,000 CJ est. value
Janesville, WI 53545

Janesville Ice Arena - City of Janesville
Demolition, New Construction, Infrastructure
Pending Verification
$33,000,000 CJ est. value
Janesville, WI 53545

Hart Road Storm Water Pond - City of Beloit
Infrastructure
Conception
$400,000 CJ est. value
Beloit, WI 53511

Merrill Street Reconstruction - 77611998-92062 - City of Beloit
Infrastructure
Design
$305,000 CJ est. value
Beloit, WI 53511

Paving Work on 26th Avenue (Swamp Road)
Infrastructure
Post-Bid
$80,000 est. value

Last Updated 10/18/2023 08:40 AM
Project Title

2023 Sidewalk Maintenance

Physical Address View project details and contacts
City, State (County) Beloit, WI 53511   (Rock County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $101,555 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Furnishing labor, materials, tools, and equipment necessary for C23-08 2023 Sidewalk Maintenance. The work for which bids are asked includes the following: approximately: 5,800 sf of concrete sidewalk, 4" replacement, 700 sf of concrete sidewalk, 6" replacement, 13 lf of concrete curb and gutter removal and replacement, 32 sf of detectable warning field, and miscellaneous items associated with the above work. The Bidder to whom a Contract is awarded shall be required to furnish both a Performance Bond and a Payment Bond acceptable to the City of Beloit for 110% of the Contract Price for each of the above Bonds, in accordance with the requirement of the Contract Documents. BID REJECTION: The City of Beloit reserves the right to reject any and all bids, waive any informalities in bidding, or to accept the bid or bids, which best serve the interests of the City of Beloit. BID WITHDRAWAL: No bid shall be withdrawn for a period of sixty (60) days after the scheduled opening of the bids without the consent of the City of Beloit. A certified check or satisfactory Bid Bond payable to the City of Beloit in the amount of 5% of the Bid shall accompany each bid as a guarantee, that if the bid is accepted, the bidder will execute and file the Agreement, the Contract Performance Bond and Payment Bond, as required by the Contract Documents, within ten (10) days after the Notice of Award of the Contract by the City of Beloit. Question Deadline 07/13/2023 All Bidders must execute and file a Bidder's Proof of Responsibility Questionnaire no later than the close of business on July 13th, which is seven (7) calendar days prior to the bid opening Est. Completion Date: Oct. 30, 2023

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents