Similar Projects
HVAC Installation and Energy Infrastructure
Alteration
Post-Bid
Union City, CA

Highland Hospital Koret Building Exhaust Fan and Waterproofing
Alteration
Post-Bid
$1,900,000 est. value
Oakland, CA

Henry Robinson Multi-Purpose Center HVAC Replacement
Alteration
Results
$650,000 est. value
Oakland, CA 94612

Harvest Park Middle School Gym Boilers Replacements
Alteration
Results
Pleasanton, CA 94566

HVAC A-E and Construction Management Services
Renovation, Term Contract
Post-Bid
Less than $65,000,000 est. value
Livermore, CA 94550

HVAC Repairs
Alteration
Results
Oakland, CA 94612

District Wide Roofing and HVAC Replacement Project Package Five
Alteration
Post-Bid
Pleasanton, CA 94566

HVAC Repairs
Alteration
Results
CA

Regular and On-Call Heating, Ventilation, and Air Conditioning (HVAC) Services
Alteration
Post-Bid
Livermore, Martinez, Oakland, Oakley, Redwood City, Richmond, San Jose, San Pablo, Vallejo, CA 94603

USCG Alameda Replace HVAC and Roofs
Infrastructure
Results
$500,000 to $1,000,000 est. value
Alameda, CA

HVAC Services at Northern California DWR Facilities
Alteration
Post-Bid
Byron, CA 94514

Relocate HVAC Ductwork and Furnish and Install Fire/Smoke Dampers (Alameda County)
Alteration
Results
$388,000 est. value
Oakland, CA 94612

Air Intake Dampers Replacement Services
Alteration
Post-Bid
Oakland, CA 94612

O'Brien Hall HVAC Improvements
Alteration
Results
$160,000 est. value
Berkeley, CA

Hvac Preventive Maintenance And As Needed Repair Services
Term Contract
Post-Bid
CA

Last Updated 04/21/2023 12:03 PM
Project Title

Burbank Preschool Boiler Replacement Project

Physical Address View project details and contacts
City, State (County) Oakland, CA 94605   (Alameda County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $314,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of work includes but not limited to demolition and removal of two existing boilers, and related controls from the boiler room. Abatement of all hazardous materials based on ACC environmental report attached and dispose of all debris. Full inspection of the existing condensation pump for its condition and compliance with the new system (Replace if necessary). Installation of two (2) 3,500 MBH cast iron sectional Boilers. Installation of pressure gauges, Installation of the outdoor Air sensor for the boiler lockout, Installation of the boiler related proper safeties. Boilers to connect to the existing flue pipe. Floor drain and the natural gas is available at the boiler room and complete training. Provide As-Builds, Operational Manuals, and Warranties upon completion of the project will be required. Listed below are the recommended manufactures for this project. Boiler types: Cleaver Brooks, Raypack, Weil McLain. Feed/Condensation Pumps: SHIPCO or Similar. Gauges: U.S. Gauges, Marsh, Danton

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents