Similar Projects
SR 20/Boon Rd Vic to Eagle Vista Dr Vic - Paving
Infrastructure
Design
$1,241,000 CJ est. value
Coupeville, WA 98239

SR 20/Boon Rd Vic to Eagle Vista Dr Vic - Paving
Infrastructure
Design
$1,241,000 CJ est. value
Coupeville, WA 98239

2022 Sanitary Sewer Rehabilitation Project (Pipe-bursting)
Infrastructure
Bidding
$550,000 CJ est. value
Oak Harbor, WA 98277

Upgrade and Relocate Existing Watermains
Infrastructure
Bidding
$500,000 CJ est. value
Coupeville, WA 98239

Fakkema Access Road
Infrastructure
Post-Bid
$650,000 to $850,000 est. value
Oak Harbor, WA 98277

Tower Site Readiness Phase II Project
Infrastructure
Post-Bid
Camano Island, Darrington, Everett, Kingston, Marysville, Mountlake Terrace, WA 98208

Engineering Services for North Sound to Olympics (STO) Trail Planning Study
Infrastructure
Results
Less than $343,000 est. value

Pacific Avenue Safety - Midblock Crossing
Alteration
Results
$620,574 est. value

Demolition and Parking Lot Construction Engle Road
Infrastructure
Post-Bid
Coupeville, WA 98239

2022 to 2023 Unit Price Directional Boring Contract
Term Contract
Results
$2,000,000 est. value
Camano Island, WA

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

SR 525, Clinton Ferry Terminal Vicinity Pedestrian Connectivity
Infrastructure
Results
$750,000 to $1,000,000 est. value
WA

Hoypus Point Restoration
Infrastructure
Post-Bid
$200,000 to $240,000 est. value
Oak Harbor, WA

2022 Western Region Pavement Preservation MATOC
Alteration
Results
$300,000 to $10,000,000 est. value

Stewart Field New Restroom Building
New Construction, Infrastructure - 2,385 SF
Post-Bid
Aberdeen, WA 98520

Last Updated 01/05/2023 03:31 AM
Project Title

SR 20/Eagle Vista Dr to Ault Field Rd Vic - ADA Compliance

Physical Address View project details and contacts
City, State (County) Oak Harbor, WA 98277   (Island County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected December 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $668,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

STIP ID WA-09494 This project will evaluate and improve pedestrian safety by upgrading ADA sidewalk ramps within the project limits (MP 30.32 to MP 33.19 excepted) As of January 05, 2023, this project is in Final Planning status. Preliminary engineering has begun and environmental design is expected to be complete in the third quarter of 2021. The contract advertisement is expected in fourth quarter of 2022 and construction is anticipated to be operationally complete in the fourth quarter of 2023. WSDOT - SR 20/Eagle Vista Dr to Ault Field Rd Vic - ADA Compliance *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents