Similar Projects
Reconstruction of Barnett Avenue
Infrastructure
Bidding
San Antonio, TX 78226

CPS Bridge Riverbank Stabilization
Infrastructure
Bidding
$172,000 est. value
San Antonio, TX 78204

Construction of Johnson Ranch North Unit 9 Public Water, Wastewater, Paving and Drainage Improvements and Johnson Ranch North Unit 9 Private Paving and Grading Improvements
Post-Bid
San Antonio, TX

Construction of Streets, Drainage, Water, and Wastewater for Somerset Grove Unit 1
Post-Bid
San Antonio, TX 78200

Z--IDIQ for Stream Gage Site Rprs, Oklahoma and Texas
Results

SECO Creek Headgate Project
Results
San Antonio, TX 78215

Orsinger LWC (Low Water Crossing) 35
Infrastructure
Bidding
$900,000 est. value
TX

Olmos Park FY 2020-2021 Street and Drainage Maintenance
Post-Bid
Olmos Park, TX

Olmos Dam Drain Repair
Results
San Antonio, TX 78212

Redbird Ranch Phase 2 Unit 1M-3 and Unit 3M-3A
Post-Bid
TX 78253

Vance Jackson Low Water Crossings
Results
$6,356,000 est. value
San Antonio, TX 78205

Repair Storm Drainage at The Medical Education Training Campus (METC).
Post-Bid
$500,000 to $1,000,000 est. value
San Antonio, TX 78275

Brooks City Base Stinson Corridor (Research Plaza to South Presa Street)
Results
$6,086,452 est. value
San Antonio, TX 78205

2020 Streets and Drainage Improvement Project
Infrastructure
Post-Bid
$7,527,271 est. value
San Antonio, TX

Fire Station No. 2 Access and Drainage Improvements
Results
Schertz, TX

Last Updated 02/09/2022 09:32 AM
Project Title

South Gevers Street Drainage Improvement Project

Physical Address View project details and contacts
City, State (County) San Antonio, TX 78275   (Bexar County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $8,600,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Purpose of this project is to alleviate flooding throughout the surrounding neighborhood by constructing an underground drainage system under Gevers to tie to an existing system at Nopal, north of Fair Ave. Phase 1 will also include constructing 2 detention ponds within vacant properties to reduce impacting at the existing system. Street reconstruction will include sidewalk, curb and driveways.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents