Similar Projects
Laguna Boulevard Right Turn Lane to West Stockton Boulevard - WTR058 - City of Elk Grove
Infrastructure
Conception
Elk Grove, CA 95758

Laguna Creek Trail - Crossing at State Route 99 - WTL016 - City of Elk Grove
Infrastructure
Conception
$6,320,000 est. value
Elk Grove, CA 95624

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Laguna Creek and Whitehouse Creek Multi-Functional Corridor Project - WDR018 - City of Elk Grove
Infrastructure
Design
$3,164,000 est. value
Elk Grove, CA

Roadway Excavation, Place Cl2 Ab, HMA and RHMA, and Modify Ramp Meters
Infrastructure
Bidding
$28,000,000 est. value
CA

Place HMA, Furnish Polyester Concrete Overlay, and Concrete Barrier
Infrastructure
Bidding
$4,490,000 est. value
Sacramento, CA

Modify Ramp Metering Systems
Infrastructure
Post-Bid
CA

West Silver Eagle Bridge and Overhead Joint Repair
Renovation, Infrastructure
Post-Bid
$565,560 est. value
Sacramento, CA 95834

Sierra Highway Sidewalks
Infrastructure
Results
$375,000 est. value
Sacramento, Santa Clarita, CA 91390

Modify Ramp Metering Systems
Infrastructure
Results
$910,000 est. value
Sacramento, CA 95811

Elk Grove Florin Road Complete Street And Resurfacing Project - WTR078 - City of Elk Grove
Infrastructure
Conception
$2,894,158 est. value
Elk Grove, CA 95757

MUNI - Design Review - Northpointe Reserve - Dahlin Group
New Construction, Infrastructure
Design
Sacramento, CA 95835

Mangini Ranch Phase 2 Village 3 Joint Trench
Infrastructure
Bidding
$350,000 est. value
Folsom, CA

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Police Facilities Streetscapes Maintenance
Infrastructure
Results
Sacramento, CA

Reported 07/08/2022 09:44 AM
Project Title

Willard Parkway Landscaping Epoch Drive To Kammerer Road - WFL011 - City Of Elk Grove

Physical Address View project details and contacts
City, State (County) Elk Grove, CA 95757   (Sacramento County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2025
Bids Due View project details and contacts
Estimated Value $875,400 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will construct sidewalk and landscaping.The project is located on the west side of Willard Pkwy from Epoch Dr to Kammerer Rd. As of July 07, 2022 , this project is currently in the FY 2022-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for Fiscal Year 2024. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2025. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents