Similar Projects
LFR-15 - Replace 18", 15" and 12" with 24" Line along Claiborne Run from Morton Road to Kings Hill Road - County of Stafford
Infrastructure
Conception
$3,612,000 CJ est. value
Fredericksburg, VA 22401

Eastern Shore Drive Lynnhaven Drive Pump Station - PG100150 - City of Virginia Beach
Renovation, Infrastructure
Conception
$9,587,700 CJ est. value
Virginia Beach, VA 23451

Main Street Pump Station and Plant - City of Newport News
Infrastructure
Design
$9,285,000 CJ est. value
Newport News, VA 23601

Eastern Shore Drive - Phase I - City Of Virginia Beach
Infrastructure
Design
$43,400,000 CJ est. value
Virginia Beach, VA 23451

Well Installation and Well Abandonment
Infrastructure
Bidding
$18,850 CJ est. value
Cullen, VA 23934

Well Installation and Well Abandonment
Infrastructure
Bidding
$23,250 CJ est. value
Cumberland, VA 23040

Sewer and Grease Trap Pumping Services
Infrastructure
Post-Bid
Suffolk, VA 23434

Fawn Lake Pump Stations 27 And 58 Sewer Improvements
Renovation
Post-Bid
Spotsylvania, VA

Route 50 Pump Station Replacement
Results
$1,500,000 to $2,500,000 est. value
Winchester, VA

Kings Trail Pump Station 234 Replacement
Results
Less than $1,799,270 est. value
Virginia Beach, VA

Hill Carter WST and Pump Station - Hanover County
New Construction, Infrastructure
Construction
$10,500,000 CJ est. value
Ashland, VA 23005

Western Pressure Zone Pump Station Backup Generator - 27503 - Town of Leesburg
Renovation
Conception
$661,500 CJ est. value
Leesburg, VA 20175

Eastern Shore Drive - Vista Circle Pump Station - PG100539 - City Of Virginia Beach
Infrastructure
Design
$18,100,000 CJ est. value
Virginia Beach, VA 23454

Well Installation and Well Abandonment
Infrastructure
Bidding
$100,000 CJ est. value
Salem, VA 24153

Selma Estates Finished Water Booster Pump Upgrades
Infrastructure
Post-Bid
$300,000 CJ est. value
Leesburg, VA 20176

Last Updated 03/15/2023 06:04 PM
Project Title

Bridgewater Pump Station Emergency Generator Improvements

Physical Address View project details and contacts
City, State (County) Bridgewater, VA 22812   (Rockingham County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids
Project Status Results, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $509,500 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of November 29, 2022, this project has not yet been awarded. A timeline for award has not yet been established. The Harrisonburg-Rockingham Regional Sewer Authority (HRRSA) is soliciting Sealed Bids to construct the Bridgewater Pump Station Emergency Power Improvements project located in Bridgewater, VA. Project Location: Bridgewater Pump Station located at 610 East College Street, Bridgewater VA 22812 Providing a platform to raise the owner furnished generator and ATS, re-location of pump station electrical service, installation of new generator and ATS, removal of existing generator, and other pump station modifications as described in bid package. The work generally consists of providing an emergency diesel generator and automatic transfer switch for HRRSA's Bridgewater Pump Station. The emergency diesel generator and automatic transfer switch will be installed by Contractor as Owner-Furnish Contractor-Installed (OFCI) equipment. The project also includes providing a platform to raise the emergency diesel generator and automatic transfer switch above the 100 year flood elevation, re-location of the pump station electrical service, re-location of a split system outside unit, modifications to the existing pump building and demolition of existing emergency diesel generator, fuel tank and select electrical gear. Question Deadline 11/04/2022 at 5:00 PM ET Questions should be submitted in writing to the HRRSA via regular mail, e-mail (gthomasson@hrrsa.org) or FAX (540-434-5160), to be answered by addendum as appropriate. Earliest available delivery date for the emergency diesel generator is April 24, 2023. Earliest available delivery date for the ATS is March 6, 2023.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents