Similar Projects
Morrison High School Running Track Repairs
Infrastructure
Bidding
$550,000 CJ est. value
Morrison, IL 61270

Morrison High School Running Track Repairs
Infrastructure
Bidding
$550,000 CJ est. value
Morrison, IL 61270

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Mowing
Term Contract, Alteration
Post-Bid
Fulton, IL

Rock Falls - Routing and Crack Filling
Infrastructure
Results
Rock Falls, IL

3rd Avenue Reconstruction
Infrastructure
Results
$1,396,391 est. value
Rock Falls, IL 61071

Exceptional Care and Training Center
New Construction, Infrastructure - 49,600 SF
Pending Verification
$27,100,000 CJ est. value
Sterling, IL 61081

Celetti Parking Lot Addition
Infrastructure
Bidding
$200,000 CJ est. value
Rock Falls, IL 61071

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Oppold Marina Site Improvements
Infrastructure
Results
Sterling, IL 61081

Pavement Resurfacing
Term Contract
Post-Bid
$200,000 est. value
Morrison, IL

HMA Surface
Infrastructure
Results
Fulton, IL 61252

Pavement Resurfacing
Infrastructure
Post-Bid
$200,000 est. value
Morrison, IL

Removal and Replacement of Existing Pavement Including Earthwork
Infrastructure
Results
$1,396,391 est. value
Rock Falls, IL

2022 GM Route(s) Grove Hill Cemetery
Infrastructure
Post-Bid
$54,000 est. value
Morrison, IL 61270

Last Updated 08/18/2023 09:55 AM
Project Title

County Line Road Hahnaman Road District

Physical Address View project details and contacts
City, State (County) Morrison, IL 61270   (Whiteside County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $141,410 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

City/County - Whiteside 23-44000-01-gm Const. Pvm't. Resurf. W/hma Sc Il-9.5 C N50 (1,520 Ton), Incl. 97 S.y. Hma Surf. Rem., Butt Jt., 7,880 Lb. Bit. Matl's. (Tack Ct.), 154 Ton Agg. Shld., Ty. B. And 1 L.s. Rr Prot. Liability Ins. (1.49 Mi.) Project Location: County Line Rd. Between Hahnaman Rd. And Rr Crossing Proposals requiring prequalification of bidders will be issued only to those contractors who are qualified with the Department of Transportation. Prequalification forms may be secured from the Engineer of Construction, Administration Building, 2300 South Dirksen Parkway, Springfield, IL 62764. ILDOT - Const. Pvm't. Resurf. W/hma - 23-44000-00-GM

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents