Similar Projects
Repair & Improvement to County Ditch No. J21
Infrastructure
Bidding
$726,215 CJ est. value
Albert Lea, MN 56007

Lime Lake Rock Arch Rapids Installation
Infrastructure
Bidding
$70,000 CJ est. value
Slayton, MN 56172

Water Softener Installation
Post-Bid
Faribault, MN

2022 Seasonal Work and Materials
Term Contract
Post-Bid
Faribault, MN

Plumbing Service
Term Contract
Results
$250,000 est. value
Moorhead, MN

General Contractor for 1314 North 44th Avenue Piping
Alteration
Results
Minneapolis, MN 55412

Pipe Insulation
Term Contract
Post-Bid
MN

Century High School - Pool Addition - Bid Package 02
Alteration
Results
Rochester, MN 55906

Plumbing Services at all MCES Locations
Alteration
Post-Bid
Minneapolis, MN

Curling Facility Refrigeration System Replacement
Renovation, Alteration
Results
Duluth, MN 55802

Twin Cities Habitat for Humanity Plumbing
Alteration
Post-Bid
Saint Paul, MN 55106

2021 Plumbing Infrastructure Upgrade Program
Alteration
Results
Minneapolis, MN

Birch Lake ES Domestic Piping Replacement
Alteration
Post-Bid
White Bear Lake, MN 55110

Mechanical Pipefitting Services for all MCES Facilities
Alteration
Results
MN

Plumbing Services 2022
Alteration
Post-Bid
Saint Paul, MN

Last Updated 12/13/2022 04:12 PM
Project Title

Earl Swain WMA Water Control Structure Replacement

Physical Address View project details and contacts
City, State (County) Elysian, MN 56028   (Le Sueur County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status All Bids Received, Selection Underway, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

A. The work will be done under one prime contract that includes: General Construction. B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1. Excavating & salvaging topsoil from the existing wetland containment embankment. 2. Furnishing and installing clay borrow to reestablish the proper embankment elevation. 3. Removing the existing CMP outlet structure 24" CMP Inlet pipe, and 15" CMP outlet piping. 4. Constructing a new 4'W x6'Lx8'H modified precast concrete box water control structure with an attached 6' wide modified RC box apron. 5. Installing a 12" RC inlet over the new 12" outlet piping. 6. Appurtenant work. C. DESCRIPTION OF ALTERNATES - NONE D. DESCRIPTION OF UNIT PRICES The Bid must be based upon the estimated quantities listed in the bid worksheet within the VirtuBid area of the Quest CDN plan room for this project. Responders must provide a unit price for each item described in the bid worksheet within the VirtuBid area of the QuestCDN plan room for this project. See subsection 1.14(C) Considerations of Responses of Section 00 21 23 Instructions to Responders for additional detail on how unit prices will be utilized under a Contract. Pre-Bid Meeting Info: No Pre-Bid Meeting Est. Completion Date: Aug. 25, 2023 If a responder discovers an error or needs additional clarification regarding the unit prices described in the bid worksheet described above, submit a question by the end of the question-and-answer period stated in Section 00 11 14 Solicitation Advertisement Information. See subsection 1.03(B) Examination of Site and Documents of Section 00 21 23 Instructions to Responders for additional detail. The contractor's completed bid worksheet will be incorporated into the final contract.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents