Similar Projects
Reported | 05/20/2022 04:12 PM |
Project Title | Racetrack Water Tower Booster Pump Station (Re-Bid) |
Physical Address | View project details and contacts |
City, State (County) | Homestead, FL 33035 (Miami-Dade County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Lift and Pump Stations |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | $899,900 [brand] Estimate |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Site work and new construction of a civil project in Homestead, Florida. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project. The construction and services required by the Contract Documents, which includes all labor, materials, equipment, and services to be provided by the Contractor to fulfill the Contractor's obligations.The construction and services required by the Contract Documents, which includes all labor, materials, equipment, and services to be provided by the Contractor to fulfill the Contractors duties and obligations imposed by the Contract Documents.The Contractor shall construct all joints in concrete at the locations shown on the Plans. Joints required in concrete structures are of various types and will be permitted only where shown on the Plans, unless specifically accepted by the Engineer. The Contract will be awarded based on the Total Base Bid Amount. The City reserves the right to award or reject any or all bids. An item of work not provided for in the awarded contract as previously modified by Change Order, but which is found by the Architect/Engineer to be necessary to complete the work within the intended scope of the Contract. Liquidated Damages: The amount that the Contractor accepts, as stipulated herein, that will be deducted from the Contract Sum for each Calendar day of delay due to a Non-excusable Delay. Liquidated indirect Costs: The amount stipulated in the Bid Form that will be added to the Contract sum for each Calendar Day of delay due to a Compensable Delay. The Contractor accepts this sum as full compensation for the Contractors and all its Subcontractors Indirect Costs, for each day of Excusable Compensable Delays. Bonds executed by the Contractor and his Surety, on the attached forms, assuring that the Contractor will, in good faith, perform and guarantee the work in full conformity with the terms of the Contract Documents and will promptly pay all persons supplying the Contractor with labor, materials, or supplies, used directly or indirectly by the Contractor in the prosecution of the Work. The estimated budget for this project is $750,000.00. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||
Details | Lift and Pump Stations, New Construction.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |