Similar Projects
Reduce Congestion and Increase Mobility on KY 1297
Infrastructure
Conception
$10,660,000 CJ est. value
Glasgow, KY 42141

Address Pavement Condition of AC Pavement
Infrastructure
Conception
$4,000,000 CJ est. value
Glasgow, KY 42141

Caliber Collison - Abercrombie and Associstion
New Construction, Infrastructure - 14,704 SF
Design
$4,000,000 CJ est. value
Walton, KY 41094

Caliber Collison - Abercrombie and Associstion
New Construction, Infrastructure - 14,704 SF
Design
$4,000,000 CJ est. value
Walton, KY 41094

Bridge Superstructure Replacement - CR 1104
Demolition, New Construction, Infrastructure
Bidding
$385,000 CJ est. value
Jackson, KY 41339

New Community Center Building
New Construction, Infrastructure - 3,000 SF
Bidding
$6,740,000 CJ est. value
Brooksville, KY 41004

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Baseball Field Backstop Safety System
Results
Union, KY 41091

Locust Street Water Line Replacement and Brookwood Drive Sewer Force Main Replacement
Infrastructure
Results
$328,000 est. value
Walton, KY 41094

Florence Apartments
New Construction, Infrastructure
Construction
$25,000,000 CJ est. value
Florence, KY 41042

Stuart Powell Field Airport T-Hangar and Apron Replacement Project
Infrastructure
Construction
$1,899,829 CJ est. value
Danville, KY 40422

Renaissance on Broadway
New Construction, Infrastructure - 20,000 SF
Pending Verification
$20,000,000 CJ est. value
Louisville, KY 40211

UofL Health Medical Center South
New Construction, Infrastructure
Pending Verification
$80,000,000 CJ est. value
Shepherdsville, KY 40165

Address Pavement Condition of Louie B. Nunn Cumberland Parkway
Infrastructure
Conception
$4,400,000 CJ est. value
Glasgow, KY 42141

Last Updated 01/25/2023 05:08 PM
Project Title

2022 AC Waterline Replacement Rebid

Physical Address View project details and contacts
City, State (County) La Center, KY 42056   (Ballard County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status All Bids Received, Selection Underway, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

For furnishing labor and materials and performing all work as set forth in this Advertisement for Bids, General Conditions, Special Conditions, Specifications, and/or Drawings prepared by HMB Professional Engineers, Inc., 3 HMB Circle, US 460, Frankfort, KY 40601, (502) 695-9800. Contact mbaker@hmbpe.com with any questions. Please submit questions by 10:00 AM on Thursday January 19, 2023. The work to be bid upon is described as follows: - Install 2,070 LF 6" PVC SDR-21 water line. - Install 60 LF 10" steel open cut casing. - Install 2 hydrants. - Install 6 gate valves - Replace 23 existing customer services - 3 connections to existing lines - Time allowed for completion of the Project is 120 consecutive calendar days. Drawings, Specifications and Contract Documents may be examined in person at LaCenter City Hall or HMB Professional Engineers during normal business hours by appointment. There will NOT be a pre-bid meeting for this project. After award of a contract, the General Contractor will be furnished, without charge, two (2) sets of plans and specifications. Subcontractors, manufacturers, and suppliers shall obtain plans and specifications from the General Contractor. Work is expected to take place in the months of March and April of 2023. If forwarded by mail, the sealed envelope containing the proposal must be enclosed in another envelope and mailed to the City of LaCenter 333 Broadway St., LaCenter, KY 42056 allowing sufficient time for such mailing to reach this address prior to the scheduled closing time for the receipt of proposals. Bids shall be accompanied by a certified check or bid bond payable to the City of LaCenter in an amount not less than ten percent (10%) of the base bid. No bidder may withdraw his bid for a period of ninety (90) days after the date bids are opened. He may, however, withdraw his bid at any time prior to the time and date scheduled for opening of same or any authorized postponement thereof. Any bid received after the time and date specified will not be considered and will be returned unopened to the bidder. The City of LaCenter reserves the right to reject any and all bids and to waive formalities and any bid that is obviously unbalanced may be rejected. Bidders must comply with the President's Executive Order Nos. 11246 and 11375, which prohibit discrimination in employment regarding race, creed, color, sex, or national origin. Bidders must COMPLY WITH Title VI of the Civil Rights Act of 1964, the Anti-Kickback Act, Section 3 Segregated Facilities, Section 109 and the Contract Work Hours Standard Act. Federal law prohibits discrimination on the grounds of race, color, national origin, religion, age, handicap, and sex in this project. Minority firms are particularly encouraged to participate.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents