Similar Projects
Bud Meeks Lift Station Improvements 2022
Renovation
Design
$285,000 CJ est. value
Fort Wayne, IN 46802

Contractor - Madison Street Lift Station Rehabilitation Project
Renovation
Bidding
$4,000,000 est. value
Merrillville, IN 46410

Bored HDPE Pipe Force Main Installed From Spider Creek Lift Station to Denson Avenue With Two (2) Air Relief Valves Including Two Manholes Installed
Infrastructure
Bidding
$300,000 CJ est. value
Bedford, IN 47421

Wastewater Treatment Plant And Lift Station Upgrade
Post-Bid
Rochester, IN

Lake Station Crossroads Lift Station Replacement - Section 219
Post-Bid
$1,000,000 to $5,000,000 est. value
Lake Station, IN

Crawfordsville Board of Public Works and Safety Big Four Arch Lift Station
Results
Crawfordsville, IN

Schoolview Drive Lift Station Improvements
Results
Rochester, IN

Deep Rock Test Well #2
Infrastructure
Bidding
$300,000 CJ est. value
Fort Wayne, IN 46802

Calumet Avenue Booster Pump Station Improvements-Contract 5
Post-Bid
Dyer, IN 46311

Junior Warfield Lift Station Drive Replacement
Results
Less than $388,420 est. value
Evansville, IN

Newton County Fairgrounds On-Site Sewage Treatment System
New Construction, Infrastructure
Bidding
$404,000 CJ est. value
Morocco, IN 47963

Edgewater Lift Station Replacement
Post-Bid
Elkhart, IN

LTCP Phase II Improvements
New Construction
Results
IN 46952

Victoria Lift Station Improvements
Post-Bid
Newburgh, IN

Eastside Regional Interceptor and Lift Station
Results
Franklin, IN 46131

Last Updated 08/08/2022 11:40 AM
Project Title

Woodlan Lift Station Improvements

Physical Address View project details and contacts
City, State (County) Woodburn, IN 46797   (Allen County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022,
Bids Due View project details and contacts
Estimated Value $530,100 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of constructing the following: The project includes but is not limited lodir High includes replacing existing pumps, constructing a new valve vault, upsizing discharge piping, replacing the existing control paneT, upsizing the electrical service, and all other work required for the complete modifications to the lift station. Bids will be received for a single prime Contract. Bids shall be as shown in the Bid Form.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents