Similar Projects
USFS Region One Timber Stand Improvement and Hand Fuels Treatments
Alteration
Bidding

USFS Region One Timber Stand Improvement and Hand Fuels Treatments
Alteration
Bidding

Turner Boulevard Trail Tree Planting
Alteration
Post-Bid
Omaha, NE 68105

Landscape and Maintenance Services at Park Omaha 2021
Term Contract
Post-Bid
Omaha, NE 68102

Power Substation Bare Ground Weed Control CO/WY/NE
Term Contract
Results

Power Substation Bare Ground Weed Control CO/WY/NE
Term Contract
Results

Golf Course Irrigation
Alteration
Bidding
Omaha, NE 68164

Zorinsky Tree Removal Phase 2
Term Contract
Post-Bid
Omaha, NE

Park Irrigation System Winterization - 2021
Alteration
Results
Omaha, NE

Tree Trimming 2022
Alteration
Post-Bid
Grand Island, NE

Fall Street Trees
Alteration
Results
Lincoln, NE

2021 Street Trees
Alteration
Post-Bid
Omaha, NE

ROW Street Tree Removals
Alteration
Results
Omaha, NE

Landscape Maintenance Services - South 48th Street Streetscape, Calvert to Pioneers
Term Contract
Post-Bid
Lincoln, NE 68509

Grounds Maintenance for All Right Of Way (Row) Areas
Alteration
Results
Omaha, NE

Reported 01/08/2022 12:00 AM
Project Title

Bessey Nursery Irrigation Boom and Supplies

Physical Address View project details and contacts
City, State (County) Halsey, NE 69142   (Thomas County)
Category(s) Single Trades
Sub-Category(s) Landscaping/Irrigation, Plumbing
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This will be a complete replacement of a McConkey irrigation boom with a Cherry Creek NIC control system. The irrigation boom will need to have the capacity to be programmed to water in different zones within the greenhouse. It will hold the irrigation line overhead and not hand down. The bid will also need to include complete installation the labor to replace boom, rail system, PVC water line from the end of the greenhouse to the middle of greenhouse and have it in working order when finished. The boom is located in a Nexus 42' X 96' greenhouse with 18.5ft. tables and a 43" center walkway. All of the old boom and its parts will need to be removed and left on site for the nursery to use as spare parts.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Irrigation Pumps, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents