Similar Projects
Last Updated | 02/19/2021 04:36 AM |
Project Title | Intersection Improvement |
Physical Address | View project details and contacts |
City, State (County) | CO (Boulder County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $1,000,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project will replace existing signal poles and signal equipment with some minor signing and striping at the intersection of SH 119(Canyon Blvd) and Folsom St. in Boulder. Major Items 503-00018 Drilled Shaft (18 Inch) 5.000 LF 503-00036 Drilled Shaft (36 Inch) 57.000 LF 613-00306 3 Inch Electrical Conduit (Bored) 650.000 LF 614-70336 Traffic Signal Face (12-12-12) 8.000 EACH 614-70448 Traffic Signal Face (12-12-12-12) 6.000 EACH 614-70560 Traffic Signal Face (12-12-12-12-12) 1.000 EACH 614-72854 Traffic Controller Cabinet 1.000 EACH 614-72887 Microwave Vehicle Radar Detector 4.000 EACH 614-81145 Traffic Signal-Light Pole Steel (1-45 Foot Mast Arm) 1.000 EACH 626-00000 Mobilization 1.000 L S 627-30410 Preformed Thermoplastic Pavement Marking (Xwalk- Stop Line) 932.000 SF 630-00000 Flagging 50.000 HOUR 630-00003 Uniformed Traffic Control 20.000 HOUR 630-00012 Traffic Control Management 30.000 DAY |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |