Similar Projects
Bonner Gateway Mixed Use Development
New Construction
Conception
Bonner Springs, KS

Bonner Gateway Mixed Use Development
New Construction
Conception
Bonner Springs, KS

Mission Bowl Apartments Redevelopment
New Construction
Design
$29,000,000 est. value
Mission, KS 66205

Two Building Development
New Construction - 20,707 SF
Design
$500,000 to $1,000,000 CJ est. value
Overland Park, KS

Anderson Pointe
New Construction, Renovation - 75,624 SF
Post-Bid
$5,000,000 to $10,000,000 CJ est. value
Olathe, KS

New Horizon Academy
New Construction - 8,826 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Leawood, Overland Park, KS 66224

Parking Garage Repair
Renovation
Results
Wichita, KS 67202

Aquatic Center Pool House Replacement, New Multi-Purpose Building Construction, Bike/Walk Trailhead
Infrastructure
Results
Leawood, KS

Legends 267 Apartments and Parking Garage
New Construction - 510,000 SF
Pending Verification
Kansas City, KS 66100

Legends 267 Apartments and Parking Garage
New Construction - 510,000 SF
Pending Verification
Kansas City, KS 66100

5700 King Apartment Complex
New Construction
Conception
Shawnee Mission, KS

Ridgeview Corporate Centre
New Construction
Design
Lawrence, KS

Union at the Loop
New Construction - 1,291,560 SF
Post-Bid
$10,000,000 CJ est. value
Lawrence, KS 66046

Hoisington Outdoor Pool
New Construction, Alteration
Results
Hoisington, KS

Brookridge Mixed Use Development
New Construction
Pending Verification
Overland Park, KS

Reported 11/23/2021 12:00 AM
Project Title

Avante Apartments

Physical Address View project details and contacts
City, State (County) Wichita, KS 67205   (Sedgwick County)
Category(s) Entertainment/Recreation, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Clubhouse/Social Club, Parking Garage, Swimming Pool(s)
Contracting Method General Contractor to Subcontract.
Project Status Sub-Bidding, Construction Start Expected first quarter 2022
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000 [brand] Estimate
Plans Available from Owner
Owner View project details and contacts
Architect View project details and contacts
Description

The Avante, consisting of fourteen wood-framed three-story apartment buildings containing Three Hundred Seventy Two, one, two and three bedroom apartments, a wood framed clubhouse with a swimming pool, maintenance/dog wash building, pool equipment buildings and 11 single story wood framed garage buildings.

Details

466,356 SF - Clubhouse/Social Club, 5,306 SF New Construction, Parking Garage, 48,532 SF New Construction, Apartments/Condominiums, 3 Stories Above Grade, 412,518 SF New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating, Special Coatings, Cementitious Coatings.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Residential Equipment, Residential Appliances.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Underwater Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents