Similar Projects
Cleaning of Kitchen Exhaust Hood Systems (Inside and Out)
Term Contract
Bidding
Greensboro, NC

Hines Hall Chilled Water Coils Replacement
Alteration
Bidding
$200,000 est. value
Greensboro, NC 27401

Chiller Plant Replacement for Southern Elementary School
Post-Bid
Greensboro, NC 27406

Jet Bridges Pc Air And Gpus
Post-Bid
Greensboro, NC

NCA and T - Fume Hood Replacements
Results
$500,000 est. value
Greensboro, NC

Chiller Plant Replacement for Northwest Middle School
Results
Greensboro, NC 27409

Air Conditioning System Trainer With H-Block
Post-Bid
Greensboro, NC 27407

Cone ES RTU Replacement
Results
Greensboro, NC 27405

Elm Towers and Morehead Courts HVAC Renovation
Alteration
Post-Bid
High Point, NC

Pleasant Garden Cooling Tower Replacement
Results
Pleasant Garden, NC 27313

Hood Cleaning Summer 2021
Alteration
Post-Bid
Greensboro, NC

Cooling Tower Water Treatment Program - 21
Term Contract
Results
Greensboro, NC 27412

PTI Cooling Tower and Chiller Replacement
Alteration
Post-Bid
Greensboro, NC

Proctor Hall Cooling Tower Replacement
Alteration
Results
Greensboro, NC

Fire Extinguisher and Kitchen Exhaust Hood Inspections
Alteration
Post-Bid
Greensboro, NC 27401

Reported 06/17/2022 12:00 AM
Project Title

Greensboro SHP HVC Replacement

Physical Address View project details and contacts
City, State (County) Greensboro, NC 27401   (Guilford County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Mechanical Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor shall provide all materials, equipment and labor necessary to install and set into operation the heating and air conditioning equipment as shown on the Engineering Drawings and as contained herein. B. Intent of the drawings and specifications is to obtain complete systems, tested, adjusted, and ready for operation. C. Include incidental details not usually indicated or specified, but necessary for proper installation and operation.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents