Similar Projects
Sixth Street, Hampshire To Vermont Streets - 15709 - City of Quincy
Infrastructure
Design
$4,270,000 CJ est. value
Quincy, IL 62301

Sixth Street, Hampshire To Vermont Streets - 15709 - City of Quincy
Infrastructure
Design
$4,270,000 CJ est. value
Quincy, IL 62301

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Water Main Improvements
Infrastructure
Post-Bid

Concrete Replacement Work at Indian Hills (IL 16-1)
Infrastructure
Post-Bid
$130,000 CJ est. value
Quincy, IL 62301

2021 MFT Motor Fuel Asphalt Resurfacing
Infrastructure
Results
$884,664 est. value
Quincy, IL

Elm Street - North 6th to North 7th Roadway, Water Main, and Sewer Improvements
Infrastructure
Results
$815,754 est. value
Quincy, IL 62301

Quincy Medical Group Hospital
New Construction, Infrastructure - 68,000 SF
Pending Verification
$61,142,058 CJ est. value
Quincy, IL 62301

Quincy Regional Airport - New Apron, Taxi Lane, and Road
New Construction, Infrastructure
Design
$2,400,000 CJ est. value
Quincy, IL 62305

Parking Lot Repair - John Wood Community College Main Campus
Infrastructure - 125,000 SF
Bidding
$400,000 CJ est. value
Quincy, IL 62305

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

CERL - Farber Drive Entrance Extension
Infrastructure
Results
$337,677 est. value

2022 Motor Fuel Tax Asphalt Resurfacing
Infrastructure
Bidding
$220,000 CJ est. value
Quincy, IL 62301

Bituminous Surface Treatment
Infrastructure
Post-Bid
$400,000 est. value
Quincy, IL

Last Updated 12/30/2022 03:31 PM
Project Title

North 52nd Street - Water Main Extension

Physical Address View project details and contacts
City, State (County) Quincy, IL 62305   (Adams County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of approximately 420 feet of 8 water main in open trench, 155 feet of 8" water main in uncased bore, two 8 water main line stops, 1 fire hydrant, associated fittings, 1 meter vault, 14 sq yards of pavement replacement, 228 square feet of sidewalk replacement, 18 feet of curb and gutter replacement, seeding, and related improvements. All bids shall be accompanied by a bank cashiers check, for not less than 5 percent of the amount bid, or for the amount listed in the specifications. The Adams County Board reserves the right to reject any or all bids and to waive technicalities. No bid may be withdrawn after the time for opening of the bids is past. The County of Adams is an Equal Opportunity-Affirmative Action Employer and encourages minority group participation in the bidding and construction process. Bidders are notified that not less than the prevailing wage rate as determined by the Illinois Department of Labor shall be paid to all workers performing work under this contract. Extension of the 8 inch water main from Maine Street approximately 500 feet and conversion of the existing private 8 inch water main serving Adams County facilities to a public water main In Quincy, on North 52nd Street, from Maine Street to Broadway The NORTH 52ND STREET - WATER MAIN EXTENSION consists of extending an 8 inch water main from the intersection of North 52nd & Maine east along North 52nd Street approximately 500 feet and connecting the main to the existing water main serving various Adams County facilities. The existing water main along North 52nd will be converted to a public water main by installing a new meter vault for the Highway Department, new interior meter for the Juvenile Detention Facility, and removing the existing meter vault at 52nd & Broadway.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents