2021 Fabric-Formed Erosion Protection Project
Bidding
Pembroke Pines, FL 33027

Monterra Lake Bank Stabilization
Post-Bid
Coral Springs, FL

Construction Management at Risk Services
Post-Bid
Hollywood, FL 33022

Drainage
Results
Less than $250,000 est. value
FL

Transportation and Surface Drainage and Ongoing Rehabilitation Program
Results
$861,319 to $1,019,136 est. value
Southwest Ranches, FL 33332

45th Year CDBG Drainage Improvement Project
Post-Bid
Less than $189,761 est. value
Hallandale, FL 33009

Bonaventure Boulevard and Fire Station 55 Drainage Improvement
Results
Weston, FL 33326

Construction Services for Pier Street West
Post-Bid
Pompano Beach, FL 33060

Port Everglades, South Jetty Rehabilitation 2020, Broward County, Florida
Results
$1,000,000 to $5,000,000 est. value
FL

Dania Cove/Southwest 25th Terrace Drainage Improvements
Renovation
Post-Bid
Dania Beach, FL 33312

Desilting
Results
Less than $350,000 est. value
FL

NE 27th Avenue Drainage Improvements
Post-Bid
Lighthouse Point, FL

Oakhill Culvert Replacement
Results
Less than $200,000 est. value
Davie, FL 33314

Canal Bank Erosion Tubing
Term Contract
Results
Margate, FL 33063

Historic Miramar Drainage System Improvements Phase V
Results
$400,000 to $550,000 est. value
Miramar, FL 33025

Reported 03/31/2021 12:00 AM
Project Title

Construction of WTP Lime Sludge Holding Ponds Sheet Piles

Physical Address View project details and contacts
City, State (County) Hollywood, FL 33024   (Broward County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $620,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Currently the City of Pembroke Pines has three lime sludge holding ponds at the Water Treatment Plant (WTP). Each of the treatment units discharges to two (2) of the ponds for settlement and accumulation. The settled sludge accumulates and begins to dry at which time partial transfers from the two ponds are made towards the last pond (drying pond). The City believes the installation of sheet piles within the perimeter of the two (2) access/service roads will improve upon the safety of the sludge transfer operation, in addition to increasing the volume of the ponds.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls, Driven Piles, Steel Piles, Sheet Steel Piles.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents