Similar Projects
Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Roadside Safety Improvements
Infrastructure
Design
$3,831,000 est. value
Holtville, CA

Calexico West Land Port Of Entry Phase 2B
New Construction, Infrastructure
Bidding
$93,000,000 CJ est. value
Calexico, CA 92231

RFQ D/B - Design-Build Pre-Qualification for the Gomez Park Project
Infrastructure
Bidding
$5,200,000 CJ est. value
El Centro, CA 92243

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Drilling Services
Term Contract
Post-Bid
Calexico, CA

Dogwood Avenue Improvement Project
Infrastructure
Results
$900,000 est. value
El Centro, CA

Heber Avenue Improvements
Infrastructure
Results
$953,375 est. value
Heber, CA 92249

Heber Meadows Apartments Residential Development / El Centro
New Construction, Infrastructure
Design
$108,633,600 CJ est. value
El Centro, CA 92243

Dogwood Road Improvements at Wake Avenue and Danenberg Drive
Infrastructure
Bidding
$1,440,000 CJ est. value
Brawley, CA 92227

Pavement Replacement
Infrastructure
Post-Bid
$280,000 est. value

Street Maintenance Improvement Project - FY 2021/2022
Infrastructure
Results
Calipatria, CA 92233

Minor B - Small Business (SB) - Place Micro-Surfacing and Install Bike Facility
Infrastructure
Post-Bid
$330,000 est. value
Calipatria, CA 92233

Underground Utility Facility (Potholing) Services
Infrastructure
Results

Asphalt Seal Coat and Restripe at Various Sites
Infrastructure
Post-Bid
$60,000 est. value
Imperial, CA

Last Updated 09/06/2022 01:36 PM
Project Title

Orchard Road Improvements From State Route 7 to Alamo River

Physical Address View project details and contacts
City, State (County) Holtville, CA 92250   (Imperial County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected October 2022 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $1,535,069 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Orchard Road Improvements From State Route 7 to Alamo River (City Of Holtville Limits) The contractor shall possess a California contractor's license, Class A, at the time this contract is awarded. In all contracts subject to this part where state or federal funds are involved, no bid submitted shall be invalidated by the failure of the bidder to be licensed in accordance with the laws of the State of California. However, at the time the contract is awarded, the contractor shall be properly licensed in accordance with the laws of the State of California. The first payment for work or material under any contract shall not be made unless and until the Registrar of Contractors verifies to the agency that the records of the Contractors' State License Board indicate that the contractor was properly licensed at the time other contract was awarded. Any bidder or contractor not so licensed shall be subject to all legal penalties imposed by law, including, but not limited to, any appropriate disciplinary action by the Contractors' State License Board. Technical questions or clarifications must be in writing and should be directed to the Imperial County Department of Public Works, Attention to Robert Urena III, Civil Engineer Assistant II, at 155 S. 11th Street, El Centro, CA 92243 or emailed to roberturena@co.imperial.ca.us before July 12, 2022. No questions will be responded to after this day. Questions about alleged patent ambiguity of the plans, specifications, or estimate must be submitted communicated as a bidder inquiry before bid opening. Any such inquiries or questions, submitted after bid opening, will not be considered as bid protests. Bid security shall accompany the bid in the form of a certified or cashier's check, or a Bid Bond for ten (10) percent of the maximum bid amount being proposed. The successful bidder shall furnish a payment bond and a performance bond, both equal to 100% of the contract amount. The submission of a labor and materials bond (payment bond) is required on projects in excess of $25,000.00.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents