Similar Projects
Pavement Resurfacing With Guide Rail and Sign Replacement, i-81 From Exit 7 To Cortland County Line, Towns Of Baker, Lisle and Triangle
Infrastructure
Bidding
$20,600,000 est. value
Barker, Chenango Forks, Lisle, NY 13746

New York State Department of Environmental Conservation Culverts
Infrastructure
Bidding

2021 Catchbasins, Manholes, and Streets and Utilities Improvements
Post-Bid
Binghamton, NY

2021 ADA Replacement
Post-Bid
Binghamton, NY

Harry L Drive and Reynolds Road Pavement Preservation
Results
Less than $800,000 est. value
Johnson City, NY 13790

Pedestrian/ Bike Path Construction
Results
Less than $18,800,000 est. value
Binghamton, Vestal, NY 13850

2021 Curb and Sidewalk Replacement
Post-Bid
Binghamton, NY

Washington Street Rehabilitation 7 Hawley Street Surface Parking Lot
Results
Binghamton, NY 13901

Kemp Drive Reconstruction
Post-Bid
Endwell, NY

Windsor CSD 2020-2021 Capital Outlay
Results
Windsor, NY 13865

Curb/Gutter and Sidewalk Replacement
Post-Bid
Endwell, NY 13760

Hooper Road/Watson Boulevard Intersection Improvements
Results
$250,000 to $500,000 est. value
Endwell, NY 13760

Binghamton Municipal Parking Garage Demolition and Temporary Parking
Demolition, Infrastructure
Post-Bid
Binghamton, NY 13901

Resurfacing I-81
Results
Binghamton, Kirkwood, NY

Pedestrian Safety Improvement Project
Infrastructure
Post-Bid
Binghamton, NY

Last Updated 01/26/2022 03:22 PM
Project Title

DECO District Streetscape Improvement Project Phase 1: State Street

Physical Address View project details and contacts
City, State (County) Binghamton, NY   (Broome County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

DECO District Streetscape Improvements Phase 1: State Street This Project Is the First Phase of the Deco District Streetscape Improvement Project and Consists of Streetscape Improvements Along 1600 Linear Feet of State Street in the City of Binghamton. The State Street Segment Includes Portions of Full Depth Reconstruction, Milling and Top Course of Pavements, Curb Installations, Curb Extensions, Sidewalk Reconstruction, and Upgraded Drainage and Water Utilities. Multiple Improvements Intended to Enhance Pedestrian Safety and Comfort Include Traffic Calming Curb Extensions, New Ada Compliant Pedestrian Ramps, Pedestrian Signals and Crosswalk Treatments, Accent Lighting Elements, Street Trees and Furnishings, Pedestrian Scale Signage, Raised Mid-block Crossings, and Landscape Improvements. The Landscape Improvements Include New Curbside Plantings, Street Trees With Structural Soils and/or Tree Grates, and Green Infrastructure Measures to Assist in Storm water Management Along the Street Corridor. This project also includes new water main and lateral installations and drainage infrastructure upgrades, included in the Contract provided by the City of Binghamton.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents