Similar Projects
CA NP GOGA 469(1) China Beach Access Road
Term Contract, Infrastructure, Alteration
Design
$4,500,000 to $7,000,000 est. value
Mill Valley, San Francisco, CA 94941

CA NP GOGA 469(1) China Beach Access Road
Term Contract, Infrastructure, Alteration
Design
$4,500,000 to $7,000,000 est. value
Mill Valley, San Francisco, CA 94941

Fairground Area Waterline
Infrastructure
Bidding
$1,900,000 CJ est. value
Los Banos, CA 93635

Valve Inspection Maintenance and Repair Services
Term Contract, Alteration
Post-Bid
Santa Clara, CA

Professional Engineering Services For Water System Improvements In Madera County Maintenance District No. 36 Eastin Arcola
Infrastructure
Post-Bid
Madera, CA

8-Inch and 12-Inch Ductile Iron Water Main Replacement
Infrastructure
Results
$7,500,000 to $9,000,000 est. value
San Francisco, CA

Renovation of the Existing Underground Steam Distribution System
Infrastructure
Results
$13,222,600 est. value
Yountville, CA 94599

Locating Subsurface Facilities
Alteration
Post-Bid
Riverside, CA 92519

Hydronic Valve Replacement
Infrastructure
Results
Channel Islands Beach, CA

Water System Repair
Alteration
Post-Bid
Placerville, CA 95667

North Long Beach Collection Main Control Valve Upgrade
Infrastructure
Results
$1,116,000 est. value
Long Beach, CA 90899

Trinidad Fire Station - Potable Waterline Installation or Connection
Infrastructure
Post-Bid
Trinidad, CA 95570

3rd Street, Buena Mesa Drive, and Calimesa Boulevard 24" Recycled Water Pipeline
Infrastructure
Results
$4,000,000 to $6,000,000 est. value
Calimesa, Yucaipa, CA 92399

Hydrant and Valve Maintenance
Term Contract
Post-Bid
Granite Bay, CA

Los Nietos, Line D, Sorensen Lateral
Infrastructure
Results
$500,000 to $775,000 est. value
Los Nietos, CA 90610

Last Updated 08/30/2022 11:03 PM
Project Title

RFP - 2022 Water Master Plan

Physical Address View project details and contacts
City, State (County) Turlock, CA 95380   (Stanislaus County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This Master Plan engineering study will investigate improvements to the City of Turlock's water distribution system to insure the City has adequate water facilities to support future growth. City of Turlock understands this RFP may be inadequate to fully describe the work envisioned. Consultants should include additional tasks they deem appropriate, written reasons why a task should be included and an estimate of the fee required to complete the task. Failure to do this shall reflect on the consultant's qualifications. The comprehensive Water Master Plan shall include but is not limited to the following items. Summary and description of the Water System Projection of Water distribution demand for the 10-year and 20-year planning horizon. Evaluation of the existing Water Distribution System and identification of hydraulic deficiencies with maintenance and mitigation recommendations based upon Master Plan projected growth. Analysis of available engineering and financial alternatives for maintenance and system improvements. Evaluation of supplemental domestic water sources, including emergency supply alternatives and secondary long-term domestic supply alternatives. The evaluation shall include consideration of feasible supply, treatment and distribution facilities with costs and constraints noted. Cost estimate for required improvements to the distribution system and water treatment plant to ensure adequate capacity for both summer and winter demand and Master Plan projected growth. A short and long-term capital improvement plan (CIP) to address identified deficiencies including connection fees based on project growth. Recommendation of updates to the operational structure of the Water Distribution System. Identification of any present and future regulatory concerns for the treatment facilities and distribution system. Question Cutoff Date: 7/14/2022. This RFP will be governed by the following schedule: Approval of Contract: 8/23/2022 *All dates are subject to change at the discretion of the City The arbitrator shall have authority to decide all issues between the Parties including, but not limited to, claims for extras, delay and liquidated damages, if any, provided for in this Agreement, matters involving defects in the work product of the Professional, rights to payment, and whether the necessary procedures for arbitration have been followed. The City reserves the right to reject all proposers and/or to invite other individuals and/or firms to respond to this RFP if the proposals received are inadequate. The method of contractor selection has not been determined at this time. Request for proposals for design services is underway

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents