Similar Projects
Last Updated | 07/19/2022 11:23 PM |
Project Title | Eagle Mountain Balancing Reservoir (EMBR) Leak Repair |
Physical Address | View project details and contacts |
City, State (County) | Fort Worth, TX 76108 (Tarrant County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results, |
Bids Due | View project details and contacts |
Estimated Value | $50,000 [brand] Estimate |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Repair the leak near the adjacent to the headwall for the overflow structure located on the west embankment of the Eagle Mountain Balancing Reservoir. 1. Remove the existing soil cement in the area indicated. 2. Repair the damaged HDPE liner. 3. Test the liner repair. 4. Cover the repaired liner with concrete or non-shrink grout. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |