Similar Projects
Middlesboro Channel Clearing
Term Contract
Design
$1,000,000 to $5,000,000 est. value
Middlesboro, KY 40965

Hardwood Forest Slope Repair and Stabilization
Infrastructure
Bidding
Louisville, KY 40281

Lee County Fiscal Court - Crystal Creek Subdivision - Phase 4
Infrastructure
Bidding
Beattyville, KY

Shoreline Erosion Control Green River Lock and Dam #1
Post-Bid
$25,000 to $100,000 est. value
Reed, KY

Buffalo Lake Restoration
Post-Bid
Elizabethtown, KY

Grandview Stabilization
Results
Newport, KY

Rust Drive Bridge Erosion Remediation
Results
Less than $22,500 est. value
Taylor Mill, KY

South Ewing Avenue Drainage Improvement
Infrastructure
Bidding
$50,000 to $100,000 est. value
Louisville, KY 40206

Middlesboro, KY Channel Clearing
Post-Bid
$1,000,000 to $5,000,000 est. value
Middlesborough, KY

Concrete Retaining Wall
Results
Burlington, KY

Harmony Landing Drainage Improvement
Infrastructure
Bidding
Goshen, KY

8018 South Third Street Road - Drainage Improvement and Building Underpinning
Post-Bid
Louisville, KY 40214

Culvert Pipe
Results
KY

Refurbish the Portal 31 Exhibition Mine Tour Area
Infrastructure, Alteration
Bidding
Harlan, KY

PreQualifications for Crescent Hill Discharge System Improvements
Post-Bid
Louisville, KY

Last Updated 09/07/2021 03:09 PM
Project Title

Cane Run Bank Stabilization

Physical Address View project details and contacts
City, State (County) Lexington, KY   (Fayette County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of channel lining to improve bank stability along the eroding sections of Cane Run Creek underneath the Citation Boulevard Bridge. Two existing tributaries that flow into Cane Run Creek will be regraded to create positive slope and drainage in the main channel. Downstream of the bridge, Cane Run Creek will transition to a wider channel to match the existing cross section from the recently completed project. Above the proposed bank improvements, there will be an Upland Buffer Zone for seeding and planting. Following completion of the project, the contractor will be responsible for site restoration

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents