Similar Projects
Evans West
New Construction, Demolition - 715,000 SF
Conception
$160,000,000 est. value
Denver, CO 80204

Twin Peaks Lodge and Spa
Renovation, Addition
Conception
Ouray, CO 81427

Design Build Services for Stadium and Pool
Design
Colorado Springs, CO

Apex III Apartments
New Construction - 5,822,790 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Parker, CO 80112

Leisure Pool Resurfacing Project
Infrastructure
Bidding
Wheat Ridge, CO 80033

Bob Burger Recreation Center Play Pool Remodel
Post-Bid
Lafayette, CO

Fruita Community Center Perimeter Deck Drains
Post-Bid
Fruita, CO 81521

City Park Pool Replastering
Results
Fort Collins, CO 80521

Lap Pool Filtration System Replacement for Swimming Pool Complex
Results
Less than $60,000 est. value
Craig, CO 81625

Olde Town At Parker
New Construction - 1,309 SF
Construction
$850,000 est. value
Parker, CO 80134

Lodge at Black Forest Phase ll
New Construction - 375,358 SF
Construction
$10,000,000 est. value
Colorado Springs, CO 80908

Tosv Rec Center Pool Resurfacing Project
Post-Bid
Snowmass Village, CO

Resurfacing of the Wave Pool for the Craig Swimming Pool Complex
Results
Less than $120,000 est. value
Craig, CO 81625

Block 162
New Construction - 10,000,000 SF
Construction
$200,000,000 est. value
Denver, CO 80202

GCC Pool Replaster and Waterworks Installation
Post-Bid
Golden, CO 80401

Reported 06/10/2021 10:54 AM
Project Title

Community Center Pool Repairs

Physical Address View project details and contacts
City, State (County) Glenwood Springs, CO 81601   (Garfield County)
Category(s) Entertainment/Recreation
Sub-Category(s) Swimming Pool(s)
Contracting Method
Project Status Abandoned
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Deck grate system surrounding the Lap and Activity Pools requires repair and replacement. The plastic angle that holds the outer portion of the grate system, adjacent to the pool deck, is failing. This failure has allowed pool and cleaning water to enter the gap beaten the deck concrete pour and the overflow channel Gunite pour. The City is requesting that the plastic angle be removed, the opening between the two concrete pours be sealed properly and replacement of the curb angle, handhold bracket, and existing grates. A caulking, chinking or other product will be utilized to reseal the area between the back of the plastic curb angle and the front of the deck slab to complete the seal. There is 210LF of angle surrounding the Lap pool and 135LF of angle surrounding the Activity pool.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing.
Division 09 - Finishes, Special Coatings, Cementitious Coatings.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 22 - Plumbing, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 26 - Electrical, Special Purpose Lighting, Underwater Lighting.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents