Similar Projects
QuikTrip #4165
New Construction - 4,840 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Leander, TX 78641

Lively Tract Residential Development - Phase 4
New Construction, Infrastructure - 21,000 SF
Conception
$62,000 est. value
Georgetown, TX 78628

Palmeras Tex-Mex Con Sabor
Build-Out
Design
Georgetown, TX 78626

Northline
New Construction - 1,150,000 SF
Design
$10,000,000 CJ est. value
Leander, TX 78641

RFQ Construction Manager at Risk - Williamson County Headquarters
New Construction, Infrastructure
Bidding
$35,000,000 CJ est. value
Georgetown, TX 78626

Costco New Warehouse / Georgetown
New Construction, Infrastructure - 160,437 SF
Post-Bid
$13,260,000 CJ est. value
Georgetown, TX 78628

Target #T2342 - Beverage Bar Removal
Renovation, Demolition
Post-Bid
Cedar Park, TX 78613

Florence Range Resurfacing
Results
$159,601 est. value
Florence, TX 76527

Caughfield Phase Twelve and Thirteen Paving, Drainage, Water and Wastewater Improvements
Results
TX

HEB #01 - (Corporate Store #781)
New Construction - 121,000 SF
Construction
$10,000,000 CJ est. value
Georgetown, TX 78628

Holt Track Shop
New Construction, Infrastructure - 25,320 SF
Construction
$3,200,000 CJ est. value
Georgetown, TX 78628

QuikTrip 4183
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Georgetown, TX 78628

QuikTrip 4183
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Georgetown, TX 78628

2022 Bond - Proposition A - Florence Independent School District
New Construction, Renovation, Infrastructure
Conception
$42,750,000 est. value
Florence, TX

Toyota of Cedar Park Expansion
Addition - 31,935 SF
Design
Cedar Park, TX 78613

Last Updated 10/05/2022 03:13 PM
Project Title

QuikTrip #4184 / Georgetown

Physical Address View project details and contacts
City, State (County) Georgetown, TX 78626   (Williamson County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Food/Beverage Service, Gas Station, Paving/Reconstruction, Site Development, Vehicle Sales/Service
Contracting Method Bids by Invitation
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $575,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction is underway. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

4,993 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Concrete Finishing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Panel Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Resilient Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Screening Devices, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents