Similar Projects
Emergency Generators Systems Preventative Maintenance Repair Services
Bidding
Chicago, IL

Levee 37 Pump Station 1 and 2 Standby Generator Installation
Bidding
Mount Prospect, IL 60056

Standby Generator Testing, Maintenance and Repair Services
Term Contract
Post-Bid
Chicago, IL 60605

J059--UPS Maintenance
Post-Bid
Chicago, IL

Water Meter Transmission Unit Replacement
Results
Streamwood, IL 60107

AC Nielsen Tennis Center LED Lighting
Results
Winnetka, IL 60093

General Contractor for Building Finishes, Doors, Windows, and Electric and Gas Until
Bidding
Arlington Heights, IL

J059--UPS Maintenance
Post-Bid
Chicago, IL

NEIU Replace Electric Cable, Phase 1
Results
$1,500,000 to $2,000,000 est. value
Chicago, IL 60625

Yards College Preparatory High School Marquee Sign
Post-Bid
Chicago, IL 60609

Pullman State Historic Site Development
Renovation
Results
Less than $1,500,000 est. value
Chicago, IL 60628

Electrical Upgrades
Post-Bid
Chicago, IL

Switch Gear Reconditioning & Preventative Maintenance
Results
IL 60141

LED Light Emitting Diode Fixtures
Post-Bid
Arlington Heights, IL 60005

Lighting Fixture Upgrades
Results
Hazel Crest, Markham, IL 60428

Last Updated 07/28/2020 05:42 PM
Project Title

Maple Street Pumping Station Electrical Modifications

Physical Address View project details and contacts
City, State (County) Des Plaines, IL 60018   (Cook County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Convert the existing ungrounded 3 phase 480V electrical system to high resistance ground, install new 3 phase, 208V transformer and separate existing 208V loads to distribute across the two transformers, refeed existing panel board from existing automatic transfer switch a new double conversion battery backup power supply for powering existing PLC based control panels, furnish and install new K-factor transformer for 208V 3P subsystem, furnish and install ground system improvements including high resistance ground resistor panel and new grounding grid and conductors, modify control system to integrate new resistor panel alarms, furnish and install new double conversion uninterruptable power supply for PLC based control panels.

Details

Division 13 - Special Construction.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents