Similar Projects
Ragsdale Road - 311-43100-1050 - City of Brentwood
Infrastructure
Conception
$10,600,000 est. value
Brentwood, TN 37027

Sunset Road Phase 3 (Ragsdale to Waller) - City of Brentwood
Infrastructure
Conception
Less than $9,150,000 est. value
Brentwood, TN 37024

Pratt Road Repaving
Infrastructure
Post-Bid
Thompson's Station, TN

Cheatham Stoplog Concrete Storage Slab
Term Contract, Infrastructure, Alteration
Post-Bid
$1,000,000 to $5,000,000 est. value

Road Resurfacing on U.S. 31 (S.R. 6)
Results
Franklin, TN 37064

District Paving
Results
Franklin, TN

Resurfacing of Five Roads and/or Sections of Roads
Infrastructure
Post-Bid
$300,000 est. value
Fairview, TN

Asphalt Preparation, Crack Fill, Sealing, and Striping at the Brentwood Safety Center East
Infrastructure
Results
Brentwood, TN 37027

Dice Lampley Road Resurfacing
Infrastructure
Results
Fairview, TN 37062

Resurfacing
Infrastructure
Results

The On-Call Concrete Pavement Repair at Various Locations on Various Interstate and State Routes
Infrastructure
Results

Resurfacing
Infrastructure
Results
TN

Expansion of the Smartway Intelligent Transportation System (ITS) on I-40
Infrastructure
Results

Resurfacing on S.R. 96 from near Boyd Mill Avenue (L.M. 7.86) to U.S. 431 (S.R. 106) (L.M. 10.09)
Infrastructure
Results
TN

Resurfacing on S.R. 96 from S.R. 100 (L.M. 0.00) to the Williamson County line (L.M. 1.71)
Infrastructure
Results
$300,000 est. value
Franklin, TN 37065

Reported 07/15/2022 09:19 AM
Project Title

McEwen Drive - 311-43100-1033 - City of Brentwood

Physical Address View project details and contacts
City, State (County) Franklin, TN 37067   (Williamson County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2024
Bids Due View project details and contacts
Estimated Value $6,630,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and paving for a road / highway in Franklin, Tennessee. Conceptual plans call for site work for a road / highway; and for paving for a road / highway. This project provides for the City's payment to the City of Franklin for Brentwood's proportionate share of design engineering and construction of the proposed extension of McEwen Drive in Franklin from Wilson Pike to the Taramore subdivision, pursuant to an interlocal agreement between the cities. Extension of the road through the Taramore subdivision will be undertaken by the City and funded in part via a developer contribution. This project is in included in the City of Brentwood FY 2022-2027 Capital Improvement Plan (CIP). As of July 14, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents