Similar Projects
Philmnt/Tomlinson/Pine Road Intersection
Infrastructure
Conception
Huntingdon Valley, PA 19006

North Narberth Avenue O/AMTRAK
New Construction, Infrastructure
Design
Narberth, PA 19072

23 Moore to Geerdes
Infrastructure
Design
King of Prussia, PA 19487

2022 Road Resurfacing Project
Infrastructure
Bidding
Huntingdon Valley, PA

2022 Milling Project
Infrastructure
Bidding
$25,000 est. value
PA

High Friction Surface Treatment Services
Post-Bid
Less than $25,000 est. value
Huntingdon Valley, PA

Coach Mcnelly Stadium - Egress Enhancements
Post-Bid
Royersford, PA 19468

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

2020 Road Projects
Results
Collegeville, PA 19426

Ridge Pk Norris-Butler (W)
Infrastructure
Design
PA

Full-Depth Reclamation School Road
Infrastructure
Bidding
Limerick, PA

Paving Restoration at Whitemarsh Elementary School, Ridge Park Elementary School and Plymouth Elementary School
Infrastructure
Post-Bid
$560,000 est. value
Lafayette Hill, PA 19444

2020 Contracted Milling/Paving and Line Painting
Results
Horsham, PA 19044

2022 and 2023 Road Replacement and Repair Program
Term Contract, Infrastructure
Bidding
PA

Roadway and Bridge Reconstruction
Infrastructure
Post-Bid

Reported 03/25/2022 12:00 AM
Project Title

2022 Road Improvements Project

Physical Address View project details and contacts
City, State (County) Collegeville, Eagleville, PA 19426   (Montgomery County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Vincent Drive – Traffic Control, Leveling Course (130 Tons), 1 1/2” Milling(13,000 SY), 1 1/2” Final Wearing Course (13,000 SY); Fourth Street – Traffic Control, Leveling Course (40 Tons), 1 1/2” Milling (1,450 SY), 1 1/2” Final Wearing Course (1,450 SY); Hillside Avenue – Traffic Control, Leveling Course (40 Tons),1 1/2” Milling (1,660 SY), 1 1/2” Final Wearing Course (1,660 SY); Walker Lane – Traffic Control, Leveling Course (125 Tons), 1 1/2” Milling (4,188 SY), 1 1/2” Final Wearing Course (4,188 SY); Sunnyside Avenue – Traffic Control, Leveling Course (60 Tons), 1 1/2” Milling (1,733 SY),1 1/2” Final Wearing Course (1,733 SY); Summit Avenue – Traffic Control, Leveling Course (25 Tons), 1 1/2” Milling (765 SY), 1 1/2” Final Wearing Course (765 SY) ALTERNATE “A” -- Lexington Lane – Traffic Control, Leveling Course (95 Tons), 1 1/2” Milling (3,095 SY), 1 1/2” Final Wearing Course (3,095 SY); Caswell Avenue – Traffic Control, Leveling Course (45 Tons), 1 1/2” Milling (1,500 SY), 1 1/2” Final Wearing Course (1,500 SY), Baker Street – Traffic Control, Leveling Course (80 Tons), 1 1/2” Milling (2,750 SY), 1 1/2” Final Wearing Course (2,750 SY) Base Bid “B”- Sewer Authority Roads -- Walker Lane – Traffic Control, Leveling Course (150 Tons), 1 1/2” Milling (7,470 SY), 1 1/2” Final Wearing Course (7,470 SY), Jamestown Circle – Traffic Control, Leveling Course (40 Tons), 1 1/2” Milling (1,518 SY), 1 1/2” Final Wearing Course (1,518 SY), Roanoke Circle – Traffic Control, Leveling Course (40 Tons), 1 1/2” Milling (1,518 SY), 1 1/2” Final Wearing Course (1,518 SY); Sunnyside Avenue – Traffic Control, Leveling Course (275 Tons), 1 1/2” Milling (9,170 SY), 1 1/2” Final Wearing Course (9,170 SY); Summit Avenue – Traffic Control, Leveling Course (150 Tons), 1 1/2” Milling (5,265 SY), 1 1/2” Final Wearing Course (5,265 SY); Jennifer Lane – Traffic Control, Leveling Course (75 Tons), 1 1/2” Milling (2,520 SY), 1 1/2” Final Wearing Course (2,520 SY), Amy Drive – Traffic Control, Leveling Course (193 Tons), 1 1/2” Milling (6,450 SY), 1 1/2” Final Wearing Course (6,450 SY); Alexandria Drive – Traffic Control, Leveling Course (130 Tons), 1 1/2” Milling (4,350 SY), 1 1/2” Final Wearing Course (4,350 SY); Where Required – Base repair; storm sewer adjustments – Remove/Replace “C” & “M” Top; Manhole Casting Adjustments, Wrap/Seal Manholes.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents