Similar Projects
Contractor - County Road 720 Milling and Resurfacing
Infrastructure
Design
$10,000,000 to $25,000,000 est. value

Construction of Floresta Drive Improvements Phase II
Infrastructure
Bidding
$23,400,000 est. value
Fort Pierce, Port Saint Lucie, FL 34984

Furnish and Install Asphaltic Concrete Paving 200+ Ton
Infrastructure
Bidding
$2,000,000 est. value
FL

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

St Lucie County Landfill Phase IVA Access Road
Infrastructure
Post-Bid
$825,000 est. value
Fort Pierce, FL 34981

South 5th Street Roadway Improvements (Boston Avenue To Delaware Avenue)
Results
Fort Pierce, FL 34945

Furnish and Install Asphaltic Concrete Paving Under 200 Ton
Term Contract
Results
$750,000 est. value
Port Saint Lucie, FL

Furnish and Install Asphaltic Concrete Paving Under 200 Ton, Per Project
Term Contract
Results
Less than $700,000 est. value
Port Saint Lucie, FL 34984

Strategic Resource Evaluation Study - Highway Construction Materials
Infrastructure
Results

Construction of Port StLucie Blvd North Roadway Project
Infrastructure
Results
FL 34953

Add Lanes and Reconstruct
Infrastructure
Results
$11,967,909 est. value
FL

Interchange - Add Lanes/Milling and Resurfacing/Traffic Signals/Lighting - SR 9 (I-95) NB AND SB OFF-RAMPS
Infrastructure
Results
$4,762,737 est. value
FL

Asphalt Repair - Treasure Coast Primary Asphalt Repair - Routine Maintenance
Infrastructure
Results
$400,000 est. value

North 8th Street Roadway Improvements (Avenue D to Avenue E)
Infrastructure
Results
Fort Pierce, FL 34950

Resurfacing- SR-615 From North of Ave Q to St Lucie Blvd
Infrastructure
Results
$2,189,757 est. value
FL

Last Updated 06/16/2022 10:37 AM
Project Title

California Widening - City of Port Saint Lucie

Physical Address View project details and contacts
City, State (County) Port Saint Lucie, FL 34986   (Saint Lucie County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected July 2026
Bids Due View project details and contacts
Estimated Value $3,700,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

California Boulevard south of St. Lucie West Boulevard, is also in need of widening from two to four lanes as the corridor is failing at peak hour travel times. To increase capacity, California Boulevard requires widening from St. Lucie West Boulevard to Crosstown Parkway. This project is in included in the City of Port St. Lucie's FY 2021-2026 Capital Improvement Plan (CIP). Information regarding a design firm and the general contractor selection timeline has not been disclosed. Although a firm timeline for construction has not been determined, construction is not expected to start prior to July of 2027. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents