Similar Projects
Comprehensive Snow Removal Services for WMC Health
Term Contract
Bidding
Poughkeepsie, Valhalla, NY 12601

Material Bids 2022
Term Contract
Bidding
Pawling, NY

Soil Disposal at Six Sites in NY & NJ
Renovation
Post-Bid

Refuse/Recycling Services
Term Contract
Post-Bid

2021 Brine Wastewater Hauling and Disposal
Term Contract
Results
Holmes, NY 12531

2021 Pump Station, Wet Well Cleaning and Disposal
Term Contract
Results
Hopewell Junction, Hyde Park, Pleasant Valley, Poughquag, Red Hook, Rhinebeck, Tivoli, NY

Snowplow Services
Post-Bid
Hopewell Junction, NY 12533

2021 Snow Plowing and Sidewalk Clearing
Term Contract
Results
Poughkeepsie, NY 12601

Sidewalk Clearing
Post-Bid
Hopewell Junction, NY 12533

Bridge Washing/Deck Sealing NYSDOT Region 8
Results
Less than $1,000,000 est. value

Removal of Bulk Material
Post-Bid
Poughquag, NY 12570

Parts Washers and Waste Disposal for Dutchess County
Term Contract, Alteration
Results
NY

2021 Ice Control Abrasives
Term Contract
Post-Bid
Red Hook, NY 12571

Bridge Maintenance Contract
New Construction, Infrastructure
Results
$14,600,000 est. value
Philipstown, Poughkeepsie, Taghkanic, Wappinger, Woodstock, NY

Recycling and Trash Removal Services
Post-Bid
Hyde Park, NY 12538

Reported 10/19/2021 12:00 AM
Project Title

Snow Plowing and Removal

Physical Address View project details and contacts
City, State (County) Poughkeepsie, NY 12601   (Dutchess County)
Category(s) Heavy and Highway
Sub-Category(s) Hauling, Maintenance
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

For the plowing and removal of snow from the campus of Dutchess Community College for the 2021-2022 Winter Season. The bid shall be for a three (3) year period, with the option to renew for an additional two (2) one year periods. Contractor shall furnish the following services, as required and directed by the College, on a per storm basis. 1. Plowing of snow to include all roadways and parking areas in support of College equipment as needed and directed. Parking Lots D and E are the primary areas for snow clearing and removal. 2. Removal of snow from all parking areas and roadways. A. Removal of snow after a prolonged period of snowfall (snow accumulation gets beyond four (4) inches) shall take place after 12:00 midnight when the College parking lots are empty. B. Clean-up is done, in many cases, during off hours and on Saturdays, Sundays, and Holidays.

Details

Division 02 - Existing Conditions, Snow Control.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Site Improvements, Snow Removal.
Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents