Similar Projects
Last Updated | 07/02/2021 01:04 PM |
Project Title | Bobo Section Road Water Line Replacement |
Physical Address | View project details and contacts |
City, State (County) | Huntsville, AL (Madison County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $218,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Contractor shall: • Install temporary erosion control devices per the Erosion Control Plan; • Install approximately 1,700 linear feet of new 12-inch water main, including hydrant and valve assemblies; • Perform horizontal road bores for service lines; • Install new services on the new main; • Pressure test and disinfect the new main and services; • Install new meters and backflow preventers; • Transfer customers to the new main; • Connect the new main to the existing mains; • Repair driveways and culverts to original condition or better; • Abandon existing mains and remove old hydrants and valve boxes; • Landscape yards and right-of way to original condition or better; • Remove temporary devices (sample taps, blow-offs, erosion control devices) from the site. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |