Similar Projects
Convention Center Expansion - 6020.119 - City of Austin
Addition, Infrastructure
Conception
$14,234,396 CJ est. value
Austin, TX 78701

Convention Center Expansion - 6020.119 - City of Austin
Addition, Infrastructure
Conception
$14,234,396 CJ est. value
Austin, TX 78701

Motto Hotel by Hilton
New Construction, Infrastructure - 82,165 SF
Design
$15,000,000 CJ est. value
Austin, TX 78701

George Washington Carver Museum Cultural and Genealogy Center Phase 2A Site Utilities
Renovation, Addition, Build-Out, Infrastructure
Design
$5,100,000 est. value
Austin, TX 78702

Senna Hills MUD Effluent Storage Pond Liner Replacement
Infrastructure
Bidding
$1,000,000 CJ est. value
Austin, TX 78733

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

12", 30" & 36" Water Lines
Alteration
Results
$978,440 est. value
Pflugerville, TX 78691

Elgin High School Girls Field House Pavement Project
Results
$67,000 est. value
Elgin, TX 78621

Capitol Complex, Phase 2
New Construction, Infrastructure
Construction
$225,000,000 CJ est. value
Austin, TX 78701

BCRUA Phase 2 Raw Water Delivery System
Infrastructure
Construction
$224,786,835 CJ est. value
Cedar Park, TX 78613

Dutch Bros Coffee TX1202 / Austin
New Construction, Infrastructure - 871 SF
Pending Verification
$250,000 CJ est. value
Austin, TX 78754

Dutch Bros Coffee TX1202 / Austin
New Construction, Infrastructure - 871 SF
Pending Verification
$250,000 CJ est. value
Austin, TX 78754

Pflugerville Water Pipeline Project
New Construction, Infrastructure
Conception
$86,000,000 est. value
Pflugerville, TX

1418 Frontier Valley Multi-Residential
New Construction, Infrastructure - 69,700 SF
Design
$12,500,000 CJ est. value
Austin, TX 78741

Last Updated 04/15/2023 11:40 AM
Project Title

Kelly Lane Phase 2

Physical Address View project details and contacts
City, State (County) Pflugerville, TX 78660   (Travis County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $16,262,362 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Pflugerville Kelly Lane Phase 2 Roadway Improvements Project ID - " Kelly Lane Phase 2 Roadway Improvements" project consisting of approximately 4,200 feet of roadway from Falcon Pointe Boulevard to Moorlynch Avenue which includes earthwork, grading, flexible base, roundabout, surfacing, traffic control, pavement markings, signs, drainage structures, force main, and waterline.Access instructions for the Virtual Bid Opening will be posted as an addendum under Project ID "Kelly Lane Phase 2 Roadway Improvements". All Proposals submitted electronically will remain confidential until the opening date and time when they will be publicly "opened" and read aloud. Performance and Payment Bonds: Proposals must be submitted on the Proposal forms provided and must be accompanied by a bid bond in a penal sum of not less than five percent (5%) of the total Contract Price proposed. The security may be in the form of a bid bond furnished by a reliable surety company having authority under the laws of Texas to write surety bonds in the amount required, with such security made payable without recourse to the City. Equal Employment Opportunity: State statutes, including Prevailing wage and hour provisions and contract regulations must be adhered to as they relate to this Project. Contractors will be required to comply with all applicable Equal Employment Opportunity laws and regulations. Questions are to be submitted using the Question-and-Answer process through online. Responses to questions posted on online will be posted on the website by the City of Pflugerville for the benefit of all Offerors. A response will be posted for questions submitted until 12:00 P.M. CST on Friday March 31st, 2023.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents