Similar Projects
Repair/Maintain Airfield Stormwater System Phs II, FGWB 04-0014P2A and FGWB 04-0014P2B
Design
$5,000,000 to $10,000,000 est. value
Marietta, GA

Harrington Lane Storm Drain Replacement Project
Bidding
Lawrenceville, GA 30046

2019 Statesboro CDBG
Bidding
Statesboro, GA

241-301 Hanarry Drive (North) Storm Drain System Replacement Project
Post-Bid
Lawrenceville, GA

Stormwater Utility On-Call Contractors
Post-Bid
Duluth, GA

Water, Waste Water, and Storm Water Run-Off Usage at The Gillem Enclave
Results
Forest Park, GA 30297

Green Infrastructure Design Challenge - Continental Colony Elementary
Results
Atlanta, GA 30331

Gainesville Midland WYE Project
Addition
Bidding
GA 30501

Replacement of Storm Piping
Post-Bid
Macon, GA 31200

FY 2018 CDBG
Results
Less than $1,397,324 est. value
Cornelia, GA

Manhole Castings And Accessories
Term Contract
Bidding
Decatur, GA

New Dunbar Road Regional Stormwater Facility
Post-Bid
Byron, GA 31008

Concrete Pipe
Results
GA

781 James Circle Storm Drain Repair Project
Bidding
Lawrenceville, GA

FGWB 14-0014P2A, Maintain Airfield Stormwater System Phase II & FGWB 14-0014P2B Repair Stormwater System Phase II
Post-Bid
$5,000,000 to $10,000,000 est. value
Marietta, GA

Last Updated 02/16/2021 11:54 AM
Project Title

Medical Drive Storm Drainage Improvements

Physical Address View project details and contacts
City, State (County) Elberton, GA 30635   (Elbert County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of, but is not limited to the following major elements: Installation of approximately 110 linear feet (LF) of 48-inch Steel Reinforced (SRPE) pipe, 350 linear feet of 36-inch SRPE pipe, 550 linear feet of 30-inch SRPE pipe, and 140 linear feet of 18-inch SRPE pipe, associated storm drainage structures, pavement replacement and resurfacing, curb and gutter, and appurtenances. Time of completion for all work associated with Medical Drive Storm Drainage Improvements shall be NINETY (90) consecutive calendar days from the date of a written “Notice to Proceed” from Owner.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents