Similar Projects
Brentwood Boulevard Widening North - Phase 1 - 336-31620
Infrastructure
Conception
$7,050,340 est. value
Brentwood, CA 94513

Downtown Alley Rehabilitation - Mid Way - City Of Brentwood
Alteration
Conception
$2,100,000 est. value
Brentwood, CA 94513

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Primrose School - Orchards Shopping Center / Walnut Creek
New Construction, Infrastructure - 12,838 SF
Design
$2,800,000 CJ est. value
Walnut Creek, CA 94598

Pittsburg High School New Softball Field
Infrastructure
Bidding
$3,000,000 CJ est. value
Pittsburg, CA 94565

RFQ Contractor - Liberty High School New Classroom Buildings Project
New Construction, Infrastructure
Bidding
$25,400,000 CJ est. value
Brentwood, CA 94513

Parking Lot Sweeping and Pressure Washing and/or Steam Cleaning Services at the Concord DMV Field Office
Term Contract
Post-Bid
Concord, CA 94520

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Paving Repairs and Ramps at FHFB
Term Contract
Results
Richmond, CA

Crow Canyon Road Widening Project
Infrastructure
Results
$10,400,000 est. value
San Ramon, CA 94583

Carmel Townhomes
New Construction, Infrastructure - 23,285 SF
Pending Verification
$6,400,000 CJ est. value
Walnut Creek, CA 94596

Carmel Townhomes
New Construction, Infrastructure - 23,285 SF
Pending Verification
$6,400,000 CJ est. value
Walnut Creek, CA 94596

Solid Waste Organics Diversion - City of Brentwood
Infrastructure
Conception
$30,000,000 est. value
Brentwood, CA 94513

New Light Industrial Building - Shell
New Construction, Infrastructure - 33,000 SF
Design
$4,500,000 est. value
Richmond, CA 94804

Canal Replacement Project - Segment 5B
Infrastructure
Bidding
$31,780,000 CJ est. value
Oakley, CA 94561

Last Updated 09/07/2022 10:04 AM
Project Title

Construction Management, Inspection, And Testing Services 2022 Pavement Rehabilitation Project

Physical Address View project details and contacts
City, State (County) Moraga, CA 94556   (Contra Costa County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Request for Qualifications, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $3,800,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Town of Moraga is a small suburban, semi-rural community of 17,416 located in Contra Costa County, California. It is nestled between Oakland and Walnut Creek in the East Bay region of the greater San Francisco Bay Area. The Town is responsible for the maintenance and repair of 55.95 centerline miles of paved public streets, including 13.8 miles of arterial, 15.8 miles of collector, and 26.3 miles of residential streets. The Project location is in various residential, collector, and arterial streets within the Town of Moraga with a PCI of 60 or below. The project's scope of work includes the following: mobilization; traffic control and construction signage; clearing and grubbing, including tree trimming; traffic striping, marking, and markers removal; removal and replacement of concrete curb and gutter and concrete valley gutter; installation of ADA compliant curb ramps; construction of asphalt concrete, pavement base repairs; crack seal; microsurfacing; cape seal; mill and overlay; installation of traffic stripes, markers and markings. The intent of this RFP/Q is to obtain technical and cost proposals for the construction management, inspections, and materials testing for the owners' quality assurance during the construction of the Project. It is anticipated that the Town will execute one single contract for construction management, inspection, and materials testing services. The budget for the services to be provided in response to this RFP/Q was established in the 2022/23 Town of Moraga CIP budget. The current Construction budget for the Project is: $3,800,000 The deadline to submit questions regarding this RFP/Q is Tuesday, July 19, 2022, by 5:00 PM PDT. The construction contract is anticipated to be awarded on August 24, 2022. Assume six (6) working days after award of a construction contract until NTP, one hundred twenty (120) working days after NTP until substantial completion, twenty (20) working days after substantial completion until final completion, sixty (60) working days after final completion until project closeout and Town Council Acceptance. Per TP8-03, paving and resurfacing operations shall be completed by October 14, 2022, unless approved by the Town. Any incomplete work shall resume no earlier than May 1, 2023, as the temperature allows. The work hour restriction shall be taken into consideration when submitting the proposal.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents