Similar Projects
Chlorination Updates - Hancock Well and Oak Street Well Projects
Bidding
Midvale, Sandy, UT 84094

DFCM Construction - DWR Logan Fes Groundwater Wells Assessment
Bidding
$180,000 est. value
Logan, UT 84321

Ledges 1 and Tolman 4 Water Well Cathodic Protection System
Post-Bid
Saint George, UT

Mexican Hat SSD Well Improvements
Post-Bid
Mexican Hat, UT

Water System Drilling, Construction and Testing
Results
Heber, UT

F--New Westwater Well
Results
$100,000 to $250,000 est. value
Cisco, UT

South Well Chlorinator Upgrade 2020
Bidding
Grantsville, UT

Construction of the Coldwater Well Improvement Project
Post-Bid
Mendon, UT 84325

Milford Culinary Well Drilling Project 2019
Results
Less than $549,205 est. value
Milford, UT 84751

Drilling Rig and Services for Forge
Bidding
Milford, UT

Ras Pump System
Post-Bid
Provo, UT 84601

Well No. 8 Chlorinator Replacement
Results
Salt Lake City, UT 84119

Drilling, Construction and Testing of the Proposed Stewart Ranches Well
Post-Bid
Francis, UT 84036

Refurbishment and Upgrade of Well #4
Results
Less than $100,000 est. value
West Jordan, UT

Purchase and Deliver Well Surface and Intermediate Casing Forge
Term Contract
Post-Bid
Salt Lake City, UT 84112

Last Updated 06/11/2020 03:33 PM
Project Title

Wales Town Source Improvements Project 2019

Physical Address View project details and contacts
City, State (County) Wales, UT   (Sanpete County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $387,950
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of: Furnishing all materials, equipment, and labor to drill an 18” minimum diameter culinary well with a 440’ deep borehole and a 10” diameter casing and screen with filter pack, check alignment, install casing, sanitary seal, and develop and perform pumping tests. Remove and re-install existing pitless unit, well pump, column piping, and power cables from existing well building and pump control equipment. Install new discharge pipe to existing well building and connect to existing system piping/plumbing. Abandon existing production well. The well shall be constructed using either the cable tool or dual rotary method.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents