Similar Projects
Infrastructure Improvements Projects-Construction Qualifications
Term Contract
Bidding
Southfield, MI

Contractor Qualifications 2019-2020 Infrastructure Improvement Projects
Post-Bid
Southfield, MI 48076

Contractor Qualifications 2019-2020 Infrastructure Improvement Projects
Post-Bid
Southfield, MI 48076

2019-20 Pavement Reconstruction and Water Main Repalcement Project
Results
Huntington Woods, MI

Maintenance Modified Hand Patching Program
Results
Beverly Hills, MI

Cold Patch-High Performance, Annual Estimated Quantities
Term Contract
Post-Bid
Beverly Hills, MI

Cooley Lake Road over Teeple Creek Culvert Replacement
Results
Less than $666,360 est. value
Commerce Township, MI

Right of Way Services
Post-Bid
MI

Wise Road over Huron River Culvert Replacement
Results
Less than $827,735 est. value
Commerce Township, MI

Cold Patch - Bagged and Palletized, Annual Estimated Quantities
Term Contract
Post-Bid
Milford, MI 48381

2019 Asphalt Paving Program
Results
Birmingham, MI

Maintenance Concrete Patching Program
Post-Bid
Beverly Hills, MI

Brittany Drive Culvert Reconstruction Project
Results
Less than $699,443 est. value
Farmington Hills, MI

2020 Road Program
Post-Bid
Bloomfield Hills, MI

2019 Retaining Wall Repair Program
Results
Less than $352,738 est. value
Bloomfield, MI

Last Updated 03/04/2020 10:58 AM
Project Title

Sashabaw Road Culvert Replacement Over Whipple Lake Canal

Physical Address View project details and contacts
City, State (County) Beverly Hills, MI   (Oakland County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,058,905
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A contract for removal of the existing concrete culvert and wingwalls, removal and salvage of existing pedestrian bridge and placement of an 18-ft span by 6-ft rise precast concrete box culvert, headwall and wingwalls. Associated roadwork includes HMA surface removal, cold milling, HMA paving, guardrail replacement and restoration. Project is located in Independence Township, Oakland County, Michigan.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents