Similar Projects
Last Updated | 09/20/2022 03:02 AM |
Project Title | Buildings 5 Differential Pressure Switches |
Physical Address | View project details and contacts |
City, State (County) | Charleston, WV 25301 (Kanawha County) |
Category(s) | Single Trades |
Sub-Category(s) | Electric |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected October 2022 |
Bids Due | View project details and contacts |
Estimated Value | $125,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Buildings 5 Differential Pressure Switches Vendor Question Deadline @ 3 PM 2022-09-15 The West Virginia Purchasing Division is soliciting bids on behalf of the WV Department of Administration, General Services Division, to establish a contract for the following: To Provide, install and program a new differential pressure switch (DP) on the chilled water system of Capitol Complex building 9 in the existing location. Provide a new DP on the chilled water system of building 5, 11th floor using existing tap locations. Use of the existing taps will require the removal of approximately 250 feet of existing 2" piping. This will include piping, insulation, hangers, fittings, valves, etc. Remove piping to the provided dumpster. Reinsulate piping with fiberglass insulation with paper jacket exposed Use preformed insulation sections at fittings. The Vendor shall furnish all materials, labor, and equipment necessary to complete all Construction Services. The Vendor shall furnish any incidental work, materials, labor, and equipment that are necessary to complete the Construction Services, even if such incidental work is not explicitly included in the Project Plans. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |