Similar Projects
PSU - Animal Diagnostic Laboratory (ADL) New Building
New Construction - 40,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
State College, PA 16801

Sackett Building Renovation and Additions
Renovation, Addition
Conception
State College, PA 16802

PSU - Environmental Health and Safety (EH&S) Chemical and Radiation Waste Accumulation Facility
New Construction - 11,000 SF
Design
$7,200,000 est. value
State College, PA 16802

Spring Creek Education Building & Welcome Pavilion
New Construction - 3,190 SF
Design
$500,000 to $1,000,000 CJ est. value
State College, PA 16801

PSU Susan Welch Liberal Arts Building Enabling Work
New Construction - 140,600 SF
Bidding
$6,000,000 to $7,000,000 est. value
State College, PA

College of Engineering, Research and Teaching Space I Building (West 1)
New Construction - 284,000 SF
Sub-Bidding
Less than $167,000,000 est. value
State College, PA 16802

PSU Liberal Arts Teaching And Research Center
New Construction - 142,000 SF
Sub-Bidding
$10,000,000 CJ est. value
State College, PA 16801

Lasch Building Renovations
Renovation, Addition - 14,000 SF
Post-Bid
State College, University Park, PA 16802

Osmond Building Renovation and Osmond North Building
New Construction, Renovation - 152,000 SF
Post-Bid
$3,250,000 est. value
University Park, PA

Renovation Work
Renovation
Results
State College, PA 16801

Henning Building Replacement
New Construction - 104,000 SF
Construction
$89,600,000 est. value
State College, University Park, PA 16803

Willard Renovation Project
Renovation, Addition - 63,000 SF
Construction
Less than $25,000,000 est. value
University Park, PA

PSU Susan Welch Liberal Arts Building Enabling Work
New Construction
Sub-Bidding
State College, PA

Energy Savings Project - Pegula Ice Arena Lighting
Renovation
Post-Bid
State College, PA 16802

Deike Basement Renovation Phase 2 Geoscience Lab
Renovation - 126,649 SF
Construction
$1,250,000 est. value
University Park, PA 16802

Reported 04/27/2022 04:39 PM
Project Title

ARL Garfield Thomas Water Tunnel Renewal and Addition

Physical Address View project details and contacts
City, State (County) University Park, PA   (Centre County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method
Project Status Construction Commenced March 2022, Construction Completion Expected March 2024
Bids Due View project details and contacts
Estimated Value $25,400,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Bidders must be prequalified by Barton Malow Builders. Prequalifiaction information at https://www.bartonmalow.com/subcontractors/ The Garfield Thomas Water Tunnel Renewal & Addition Project is a renovation and system renewal of the existing facility, with an addition aimed at realignment of the main entrance and increased office spaces. The project scope includes renovation to the building interior and renovation and/or replacement of all building systems as required to bring the entire building up to code compliance and reliability of operations for the next 20 years. The water tunnel is a unique, secure test facility. The successful longevity and importance of the research conducted at this facility has made renewal of this building a logical investment for renewal. The building is home to the ARL Fluid Dynamics and Acoustics Office (FDAO) and houses specialized experimental facilities, advanced instrumentation techniques, and state-of-the-art computational resources.

Details

1 College/University, 47,444 SF Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Insulation, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents