Similar Projects
2022 Quaker Valley Culvert Reconstruction Project
Infrastructure
Design
Farmington Hills, MI

South Old Woodward Avenue Reconstruction Project (Phase 3)
Alteration
Bidding
$8,000,000 est. value
Birmingham, MI

Kenmore and Cornwall Water Main and Pavement Replacement
Infrastructure
Bidding
Berkley, MI

Central Division - Asphalt Paving Maintenance
Post-Bid

Paving & Site Lighting
Post-Bid

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

0.63 MI of Hot Mix Asphalt Cold Milling and Resurfacing, Water Main, Drainage, Concrete Curb, Gutter and Ramps, Signing and Pavement Markings on Saginaw Street from Airport Drive to Oakwood Street
Results
MI

Tanglewood Golf Community Street Resurfacing Project
Infrastructure
Bidding
New Hudson, MI

Removal of Thin Epoxy Overlay
Infrastructure
Post-Bid

Huron Valley Trail Resurfacing Project
Results
Less than $404,270 est. value
New Hudson, MI 48165

Island Road Repairs
Infrastructure
Bidding
Milford, MI 48380

FPE Cip Paving 2021
Infrastructure
Post-Bid
Waterford Township, MI 48328

Pavement Restorations
Results
Waterford, MI 48328

2022A Joint and Crack Seal Program
Alteration
Bidding
Troy, MI

Road Repair - Hma Thermal Bond
Infrastructure
Post-Bid
MI

Reported 03/21/2022 09:01 AM
Project Title

NW Section 18 Pavement Rehabilitation

Physical Address View project details and contacts
City, State (County) Troy, MI   (Oakland County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The contract will consist of the following principal items of work and appurtenances as specified herein and shown in the Appendix. The approximate quantities for the major items of work for this project are as follows: HMA, LVSP, PG 64-22 (Tier 1) Cold Milling Pavement Curb and Gutter, Conc , Det D1,2,600 Ton,28,000 Syd 2,000 Ft

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents