Similar Projects
Sixth Street, Hampshire To Vermont Streets - 15709 - City of Quincy
Infrastructure
Design
$4,270,000 CJ est. value
Quincy, IL 62301

Sixth Street, Hampshire To Vermont Streets - 15709 - City of Quincy
Infrastructure
Design
$4,270,000 CJ est. value
Quincy, IL 62301

ABS Water Co-Op Interconnect
Infrastructure
Bidding
$200,000 CJ est. value
Lima, IL 62376

Culvert Replacement
Infrastructure
Bidding
$800,000 CJ est. value
Quincy, IL 62301

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Concrete Replacement Work at Indian Hills (IL 16-1)
Infrastructure
Post-Bid
$130,000 CJ est. value
Quincy, IL 62301

Reconstruct Runway 4/22, Phase 1 (Construction)
Results
IL

2021 MFT Motor Fuel Asphalt Resurfacing
Infrastructure
Results
$884,664 est. value
Quincy, IL

Quincy Medical Group Hospital
New Construction, Infrastructure - 68,000 SF
Pending Verification
$61,142,058 CJ est. value
Quincy, IL 62301

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Elm Street - North 6th to North 7th Roadway, Water Main, and Sewer Improvements
Infrastructure
Results
$815,754 est. value
Quincy, IL 62301

Bituminous Surface Treatment
Infrastructure
Post-Bid
$400,000 est. value
Quincy, IL

CERL - Farber Drive Entrance Extension
Infrastructure
Results
$337,677 est. value

Milling and Resurfacing Including Bituminous Materials
Infrastructure
Post-Bid
$500,000 est. value
Mendon, IL 62351

2021 Sewer Repair
Infrastructure
Results
$324,396 est. value
Quincy, IL 62301

Last Updated 11/09/2022 01:35 PM
Project Title

Quincy Regional Airport - New Apron, Taxi Lane, and Road

Physical Address View project details and contacts
City, State (County) Quincy, IL 62305   (Adams County)
Category(s) Heavy and Highway, Transportation
Sub-Category(s) Aircraft Hangar, Paving/Reconstruction, Runways/Taxiways, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected April 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $2,400,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of November 9, 2022, construction documents are complete. Construction is anticipated to begin in spring 2023.

Details

Division 03 - Concrete, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 13 - Special Construction, Fabricated Engineered Structures, Metal Building Systems.
Division 21 - Fire Suppression.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Concrete Paving, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Storm Drainage Utilities.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents