Similar Projects
Last Updated | 09/29/2022 08:33 AM |
Project Title | General Construction Groomer Storage Building Forbes State Forest at Laurel Ridge State Park |
Physical Address | View project details and contacts |
City, State (County) | Rockwood, PA 15557 (Somerset County) |
Category(s) | Single Trades |
Sub-Category(s) | Concrete |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected October 2022 |
Bids Due | View project details and contacts |
Estimated Value | $624,400 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | ELECTRICAL: FDC-004-I00257.4 PN-11217005 REVISED GENERAL CONDITIONS apply for this contract. See General Conditions 2020 Edition, Revision 2, on the FDC website. Work included under this contract consists of construction of a new groomer storage building of post frame type construction, concrete slab, metal roofing and siding, insulation; site development and storm water construction, repaving of existing and new access drive and parking areas. Engineer's Estimate: $500,000 - $1 Million REVISED GENERAL CONDITIONS apply to this contract. See General Conditions 2020 Edition, Revision 2, on the FDC website. Work included under this contract consists of construction of a new groomer storage building of post frame type construction. Electrical work includes new underground electrical subfeed from an adjacent building, power and lighting circuits, devices, controls and equipment. Engineer's Estimate: $50,000 - $100,000 SMALL BUSINESS CERTIFICATION AND SMALL DIVERSE BUSINESS MPLS: Responsive bidders must hold a current small business certification from PA Department of General Services (DGS). Failure to meet this requirement may be cause for rejection. Enter the DGS Small Business Certificate Number on bid form signature page where indicated. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The Goals for this Contract are set forth below: SDB VBE 11% 3% |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |