Similar Projects
Last Updated 05/12/2021 12:01 PM
Project Title

Water System Improvements

Physical Address View project details and contacts
City, State (County) Augusta, WV 26704   (Hampshire County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,921,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Engineer Estimate: Contract #1 - $1,176,000, Contract #2 - $475,000, Contract #3 - $130,000, Contract #4 - $140,000 CONTRACT #1 – Waterline Replacement: Unit price contract to provide and install 12,145 LF 8 inch PVC waterline; 100 LF of 6 inch waterline; 1,740 LF 4 inch PVC waterline; 1,020 LF 2 inch PE temporary waterline; 30 LF of 4 inch stream crossing; 18 gate valves; 5 fire hydrants; 11 Air Release Assemblies; 6 Flushout Assemblies; 23 Service Reconnections; and other work required to provide the complete system improvements project. CONTRACT #2 – Radio Read Meters: Unit price contract to provide 1,452 radio read meters (various sizes) 11 registers and transmitters, including hand held reading device and mobile data collector to the owner. Reading device must be compatible with the owners billing software. CONTRACT #3 – Telemetry: Lump sum contract to provide a cellular SCADA system at eight (8) existing locations including; booster stations, tank sites, and altitude control valves; the Main Office, and necessary accoutrements. CONTRACT #4 – Tank Repainting: Unit price contract to pressure wash clean exterior; full blast exterior roof; powertool isolated rusted areas, prime rusted areas and overcoat the entire exterior of the tank along with inspection/spot repairs of the interior (up to 5% surface area) of the Springfield Tank #1 (20’ D x 20’ H 45,000 gallons), Springfield Tank #2 (21’ D x 20’ H 50,000 gallons), and Sunrise Tank (24’ D x 30’ H 100,000 gallons). Temporary storage of at least 18,000 gallons is required at the Sunrise Tank and will operate the Sunrise Altitude Valve. Valve replacement in each of the valve vaults of the Springfield Tanks is required to isolate each tank for repaint. Mobilization to each site is included in each line item unit price.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents