Similar Projects
1.66 Mi of Single Layer Micro-Surfacing and Pavement Markings
Infrastructure
Bidding
Monroe, MI

Cambridge to Frances River Trail Extension
Infrastructure
Bidding
$1,000,000 est. value
Lansing, MI 48911

2020 Ramp and Sidewalk Repair Program
Post-Bid
Ann Arbor, MI

Residential Development of City-Owned Lots
Post-Bid
Highland Park, MI

1.60 MI of Hot Mix Asphalt Shared use Path, Earthwork, Restoration and Pavement Markings
Results
MI

Portage Road Trailway
Results
Less than $400,500 est. value
Portage, MI

Kruse Park Boardwalk
Infrastructure
Bidding
$15,000 est. value
Muskegon, MI

City Parking Lot Sealing Striping
Post-Bid
Saint Joseph, MI

Parking Lot Analysis Services
Results
MI

Palmer Park Parking Lot Seal Coating
Infrastructure
Bidding
Port Huron, MI 48060

Fiedler Elementary Parking Expansion Acoustic Panels/Painting
Post-Bid
Flint, MI

2020 Pavement Markings
Results
Port Huron, MI

Annex and Camp Torrenta Parking Lot Reconstruction
Infrastructure
Bidding
Cadillac, MI

Pavement Markings
Post-Bid
Ishpeming, MI

Pavement Marking Services
Results
Lincoln, MI

Last Updated 07/26/2021 01:43 PM
Project Title

I-75 Ramp Guardrail and Concrete Curb

Physical Address View project details and contacts
City, State (County) MI   (Arenac County)
Category(s) Heavy and Highway
Sub-Category(s) Highway Signs/Guardrails/Barriers, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work shall consist of reconstructing the guardrail and placing concrete curb and gutter in the designated area. This work will be included in the Guardrail, Reconst, Type T item. Any existing washout area shall be filled with embankment and slope restoration. Riprap shall be placed at the end of each downspout. Slope restoration will be placed in all disturbed areas as per the attached Special Provision. Places silt fence between each downspout location and the ditch to catch any sediment runoff during construction. Remove silt fence when turf is well approved by the Engineer. Location: Begins on the I-75 Southbound off ramp to M-61 on the west side at the south end of the Guardrail run and continues southerly on the ramp for approximately 300 feet. Also, on the M-61 to Northbound ramp to I-75 on the east side for approximately 600 feet. All in Lincoln Township in Arenac County.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Guideways/Railways, Roadway Construction, Vehicle Barriers, Vehicle Guide Rails.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents