Similar Projects
Boilers/Air Conditioning Units/Expansion Vessel Tanks/ Circulators - Preventive Maintenance, On-Call Repair Services and Emergency Services at Harrisonburg Men's CCAP Facility
Term Contract, Infrastructure, Alteration
Bidding
Harrisonburg, VA 22802

Exterior Pressure Wash and Painting of Cabins at Lake Anna State Park
Alteration
Bidding
Spotsylvania Courthouse, VA 22551

Painting Services
Term Contract
Post-Bid
VA

Painting Services
Term Contract
Post-Bid
Blacksburg, VA

Church Street Waterspheroid Rehabiliation
Results
$513,500 est. value
Smithfield, VA

Painting Services
Results
$60,951 est. value
Lynchburg, VA

Charlottesville High School Interior Painting 2021
Post-Bid
Charlottesville, VA 22901

Bridge Painting
Results
Less than $2,001,000 est. value
VA

21Fy035-Ifb- Painting At Weems Elementary School
Post-Bid
Manassas, VA 20110

2021 Parking Garage Repairs Painting
Results
Roanoke, VA

Re-Paint 10 Residential Suites
Alteration
Post-Bid
Petersburg, VA

Hampton Boulevard Water Storage Tank
Results
Less than $6,350,000 est. value
Norfolk, VA 23505

Downdraft Paint Booth
Alteration
Post-Bid
Suffolk, VA

BLRI 2021 Cyclic Water Tank Cleaning
Results
VA

Wallcovering Removal and Painting Upgrades, Chesterfield County Airport
Alteration
Post-Bid
Richmond, VA 23237

Last Updated 11/18/2021 02:08 PM
Project Title

Modifications and Spot Coating of Willston Tank

Physical Address View project details and contacts
City, State (County) Falls Church, VA 22044   (Fairfax County)
Category(s) Sewer and Water, Single Trades
Sub-Category(s) Painting, Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

To provide construction services to include, in general terms, the following items of work: cleaning, spot coating, and structural improvements to the 125,000 gallon Willston Storage Tank.

Details

Division 01 - General Requirements.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 09 - Finishes, Painting.
Division 13 - Special Construction.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents